User Manual

Let's begin!
1. So that we don't have to wait for the 30 minute epoxy to dry in a later step,
let's go ahead and prepare the 4 carbon fiber pushrods and ball links for later
use. Locate the 4 carbon fiber pushrods and 4 micro ball links in the
hardware package. Lightly scuff one end of each pushrod.
2. Mix up a small batch of 30 minute epoxy. Dip the scuffed end of each
pushrod into the epoxy and insert this end into the ball link with a twisting
motion to make sure the epoxy is evenly distributed inside the ball link. Make
sure the pushrod is completely inserted into the ball link.
5
Modellbau Lindinger GmbH
Modellbau Lindinger GmbH Alte-Post-Str. 14 A-4591 Molln e-Mail: office@lindinger.at www.lindinger.at