Installation guide
Table Of Contents
- Table of Contents
- Introduction
- Hardware Installation
- Defining a Basic Configuration
- Specifications
- Regulatory Information
- Regulatory Overview
- Wireless Device Country Approvals
- Health and Safety Recommendations
- RF Exposure Guidelines
- International
- EU
- US and Canada
- Power Supply
- Radio Frequency Interference Requirements – FCC
- Radio Frequency Interference Requirements – Canada
- CE Marking and European Economic Area (EEA)
- Statement of Compliance
- Waste Electrical and Electronic Equipment (WEEE)
- Japan (VCCI) - Voluntary Control Council for Interference Class B ITE
- Korea Warning Statement for Class B ITE
- Other Countries
- Customer Support
Access Point Placement
Altitude™ 4521 Series Access Point Installation Guide
13
The following guidelines should be adhered to before cabling the Power Injector to an
Ethernet source and an Access Point:
●
Do not block or cover airflow to the Power Injector.
●
Keep the Power Injector away from excessive heat, humidity, vibration and dust.
●
The Power Injector isn’t a repeater, and does not amplify the Ethernet signal. For optimal
performance, ensure the Power Injector is placed as close as possible to the Ethernet
switch. This allows the Access Point to be deployed away from power drops.
●
Ensure the cable length from the Ethernet source (host) to the Power Injector and Access
Point does not exceed 100 meters (333 ft).