Installation manual
Power On (AC Power)
Extreme Networks EAS 200-24p Switch Hardware Installation Manual
19
Mounting the Switch in a Standard 19" Rack
Figure 7: Installing the Switch in a Rack
Power On (AC Power)
1 Plug one end of the AC power cord into the power connector of the switch and the other end into 
the local power source outlet. 
2 After powering on the switch, the LED indicators will momentarily blink green. This blinking of the 
LED indicators represents a reset of the system.
Power Failure (AC Power)
For AC power supply units, as a precaution, in the event of a power failure, unplug the switch. When 
power has resumed, plug the switch back in.
WARNING!
Installing systems in a rack without the front and side stabilizers installed could cause the rack to tip over, 
potentially resulting in bodily injury under certain circumstances. Therefore, always install the stabilizers before 
installing components in the rack. After installing components in a rack, do not pull more than one component out of 
the rack on its slide assemblies at one time. The weight of more than one extended component could cause the 
rack to tip over and may result in injury.










