Installation Instructions
Table Of Contents
Before you begin
Ensure the area where you install and use the switch meets the following environmental
requirements:
• Ambient temperature between 32°F and 122°F (0°C and 50°C).
• Relative humidity between 0% and 95% noncondensing.
• No nearby heat sources such as hot air vents or direct sunlight.
• No nearby sources of severe electromagnetic noise.
• No excessive dust.
• Adequate power source within six feet; one circuit required for each power supply.
• At least 2 inches (5.1 cm) (or one vertical rack width) on all sides of the switch unit for
ventilation.
• Adequate space at the front and rear of the switch for access to cables.
If you are installing a single Ethernet Routing Switch on a table or shelf, ensure the surface can
support at least 7 to 13 pounds (3 to 6 kilograms).
Installation preparation
To prevent damage, handle the switch carefully by using the following guidelines:
• To prevent damage from electrostatic discharge, always wear an antistatic wrist strap
connected to an ESD jack.
• Always place the switch on appropriate antistatic material.
• Support the switch from underneath with two hands. Do not touch components or connector
pins with your hand, or damage can result.
• Do not over tighten screws. Tighten until snug. Do not use a power tool to tighten screws.
For information about technical specifications for the individual switches, see Installing Ethernet
Routing Switch 3600 Series.
Installing the switch
The following procedures describe how to install an ERS 3600 Series on a table or shelf, or in an
equipment rack.
November 2017 Installation Job Aid for Ethernet Routing Switch 3600 Series 4