Installation Guide
Table Of Contents
- Table of Contents
- Preface
- ExtremeSwitching 5520 Series Overview
- Port Partitioning
- Power Supplies for Use with Your Switch
- Expansion Modules
- Site Preparation
- Building Stacks
- Installing Your Switch
- Activating and Verifying the Switch
- Installing Expansion Modules
- Installing a V300 Virtual Port Extender
- Install a V300 Virtual Port Extender on a Wall
- Install a V300 Virtual Port Extender Under or on a Table Surface
- Install a V300 Virtual Port Extender in a VESA Mount
- Install a V300 in a Single Rack Mount
- Install a V300 in a Dual Rack Mount
- Install a V300 in a DIN Rail Mount
- Install a V300-8P-2T-W Model in a Single or Dual Rack Mount
- Installing a V300-8P-2T-W Model in a DIN Rail Mount
- Connecting the V300 Virtual Port Extender to Power
- Installing a V400 Virtual Port Extender
- Installing a Half-Duplex to Full-Duplex Converter
- Install a Versatile Interface Module in a 5520 Series Switch
- Installing a V300 Virtual Port Extender
- Replacing AC Power Supplies
- Replacing Fan Modules
- Monitoring the Device
- Technical Specifications
- ExtremeSwitching 5520 Series Technical Specifications
- V300 Virtual Port Extender Specifications
- V400 Virtual Port Extender Technical Specifications
- Half-Duplex to Full-Duplex Converter Technical Specifications
- 350 W AC Power Supplies Technical Specifications
- 715 W AC Power Supplies Technical Specifications
- 1100 W AC Power Supplies Technical Specifications
- 2000 W AC Power Supply Technical Specifications
- Power Cord Requirements for AC-Powered Switches and AC Power Supplies
- Console Connector Pinouts
- Safety and Regulatory Information
- Considerations Before Installing
- General Safety Precautions
- Maintenance Safety
- Fiber Optic Ports and Optical Safety
- Cable Routing for LAN Systems
- Installing Power Supply Units and Connecting Power
- Selecting Power Supply Cords
- Battery Notice
- Battery Warning - Taiwan
- EMC Warnings
- Japan (VCCI Class A)
- Korea EMC Statement
- Glossary
- Index
Install a Versatile Interface Module in a 5520 Series Switch
This section describes how to install a versatile interface module (VIM) in the front slot of a 5520 Series
switch.
You need the following tools and materials to install a VIM:
• ESD-preventive wrist strap
• Flat head screwdriver
Caution
Extreme Networks VIMs are not hot-swappable. Disconnect power to the switch before
removing an installed VIM or installing a new VIM.
To install a versatile interface module, follow these steps:
1. Attach the ESD wrist strap to your wrist and connect the metal end to an appropriate ground point
on the rack.
2. Ensure that the switch is completely powered down.
3. Using two fingers, remove the cover plate from the VIM slot.
a. Squeeze the sides to release the plate, and pull down from the top to open. The plate will remain
attached at the bottom.
Figure 78: Removing a slot Cover Plate (VIM slot cover shown)
4. Remove the new VIM from its anti-static packaging.
5. Install the VIM in the switch:
a. Carefully slide the VIM module into the switch.
b. Insert and tighten the retaining screws you previously removed, using the screws provided.
Figure 79: Tighten Screws on the Inserted VIM Module
Install a Versatile Interface Module in a 5520 Series
Switch Installing Expansion Modules
108 ExtremeSwitching 5520 Series Hardware Installation Guide