Installation Guide
Table Of Contents
- Table of Contents
- Preface
- ExtremeSwitching 5520 Series Overview
- Port Partitioning
- Power Supplies for Use with Your Switch
- Expansion Modules
- Site Preparation
- Building Stacks
- Installing Your Switch
- Activating and Verifying the Switch
- Installing Expansion Modules
- Installing a V300 Virtual Port Extender
- Install a V300 Virtual Port Extender on a Wall
- Install a V300 Virtual Port Extender Under or on a Table Surface
- Install a V300 Virtual Port Extender in a VESA Mount
- Install a V300 in a Single Rack Mount
- Install a V300 in a Dual Rack Mount
- Install a V300 in a DIN Rail Mount
- Install a V300-8P-2T-W Model in a Single or Dual Rack Mount
- Installing a V300-8P-2T-W Model in a DIN Rail Mount
- Connecting the V300 Virtual Port Extender to Power
- Installing a V400 Virtual Port Extender
- Installing a Half-Duplex to Full-Duplex Converter
- Install a Versatile Interface Module in a 5520 Series Switch
- Installing a V300 Virtual Port Extender
- Replacing AC Power Supplies
- Replacing Fan Modules
- Monitoring the Device
- Technical Specifications
- ExtremeSwitching 5520 Series Technical Specifications
- V300 Virtual Port Extender Specifications
- V400 Virtual Port Extender Technical Specifications
- Half-Duplex to Full-Duplex Converter Technical Specifications
- 350 W AC Power Supplies Technical Specifications
- 715 W AC Power Supplies Technical Specifications
- 1100 W AC Power Supplies Technical Specifications
- 2000 W AC Power Supply Technical Specifications
- Power Cord Requirements for AC-Powered Switches and AC Power Supplies
- Console Connector Pinouts
- Safety and Regulatory Information
- Considerations Before Installing
- General Safety Precautions
- Maintenance Safety
- Fiber Optic Ports and Optical Safety
- Cable Routing for LAN Systems
- Installing Power Supply Units and Connecting Power
- Selecting Power Supply Cords
- Battery Notice
- Battery Warning - Taiwan
- EMC Warnings
- Japan (VCCI Class A)
- Korea EMC Statement
- Glossary
- Index
Safety and Regulatory Information
Considerations Before Installing on page 148
General Safety Precautions on page 149
Maintenance Safety on page 150
Fiber Optic Ports and Optical Safety on page 150
Cable Routing for LAN Systems on page 151
Installing Power Supply Units and Connecting Power on page 152
Selecting Power Supply Cords on page 153
Battery Notice on page 153
Battery Warning - Taiwan on page 153
EMC Warnings on page 154
Japan (VCCI Class A) on page 154
Korea EMC Statement on page 154
Warning
Read the following safety information thoroughly before installing Extreme Networks
products. Failure to follow this safety information can lead to personal injury or damage to the
equipment.
Only trained and qualified service personnel (as defined in IEC 60950-1 and AS/NZS 3260) should
install, replace, or perform service to Extreme Networks switches and their components. Qualified
personnel have read all related installation manuals, have the technical training and experience
necessary to be aware of the hazards to which they are exposed in performing a task, and are aware of
measures to minimize the danger to themselves or other persons.
If you are located in the United States, install the system in accordance with the U.S. National Electrical
Code (NEC).
Considerations Before Installing
Consider the following items before you install equipment.
• For equipment designed to operate in a typical Telco environment that is environmentally controlled,
choose a site that has the following characteristics:
◦ Temperature-controlled and humidity-controlled, such that the maximum ambient room
temperature shall not exceed 40°C (104ºF).
◦ Clean and free from airborne materials that can conduct electricity.
148
ExtremeSwitching 5520 Series Hardware Installation Guide