Installation Guide
Table Of Contents
- Table of Contents
- Preface
- ExtremeSwitching 5520 Series Overview
- Port Partitioning
- Power Supplies for Use with Your Switch
- Expansion Modules
- Site Preparation
- Building Stacks
- Installing Your Switch
- Activating and Verifying the Switch
- Installing Expansion Modules
- Installing a V300 Virtual Port Extender
- Install a V300 Virtual Port Extender on a Wall
- Install a V300 Virtual Port Extender Under or on a Table Surface
- Install a V300 Virtual Port Extender in a VESA Mount
- Install a V300 in a Single Rack Mount
- Install a V300 in a Dual Rack Mount
- Install a V300 in a DIN Rail Mount
- Install a V300-8P-2T-W Model in a Single or Dual Rack Mount
- Installing a V300-8P-2T-W Model in a DIN Rail Mount
- Connecting the V300 Virtual Port Extender to Power
- Installing a V400 Virtual Port Extender
- Installing a Half-Duplex to Full-Duplex Converter
- Install a Versatile Interface Module in a 5520 Series Switch
- Installing a V300 Virtual Port Extender
- Replacing AC Power Supplies
- Replacing Fan Modules
- Monitoring the Device
- Technical Specifications
- ExtremeSwitching 5520 Series Technical Specifications
- V300 Virtual Port Extender Specifications
- V400 Virtual Port Extender Technical Specifications
- Half-Duplex to Full-Duplex Converter Technical Specifications
- 350 W AC Power Supplies Technical Specifications
- 715 W AC Power Supplies Technical Specifications
- 1100 W AC Power Supplies Technical Specifications
- 2000 W AC Power Supply Technical Specifications
- Power Cord Requirements for AC-Powered Switches and AC Power Supplies
- Console Connector Pinouts
- Safety and Regulatory Information
- Considerations Before Installing
- General Safety Precautions
- Maintenance Safety
- Fiber Optic Ports and Optical Safety
- Cable Routing for LAN Systems
- Installing Power Supply Units and Connecting Power
- Selecting Power Supply Cords
- Battery Notice
- Battery Warning - Taiwan
- EMC Warnings
- Japan (VCCI Class A)
- Korea EMC Statement
- Glossary
- Index
stack. Consider these dierences when selecting a master node, selecting a backup node, and
configuring failover operation.
Note
We recommend that the master and backup roles be assigned to switches from the same
series. For example, if the master node is an X460-G2 switch, the backup node should also be
an X460-G2 switch. Similarly, if the master node is an X670-G2 series switch, the backup node
should also be an X670-G2 switch.
Note
ExtremeSwitching and X870 series switches can be stacked with themselves and each other
using V400, but they cannot be stacked with other switch models.
Note
The ExtremeSwitching X465 series switches can only be stacked with themselves, and with
ExtremeSwitching and X690 using V160.
Note
The ExtremeSwitching 5520 series switches can only stack with themselves.
When easy setup compares two switches that have the same capability, the lower slot number takes
precedence.
We recommend that you follow the same ranking hierarchy when you plan the physical placement of
the switches in the stack.
SummitStack Topologies
Figure 37 presents a graphical representation of a stack and some of the terms that describe stack
conditions.
SummitStack Topologies
Building Stacks
54 ExtremeSwitching 5520 Series Hardware Installation Guide