Installation Guide
Table Of Contents
- ExtremeSwitching VDX 8770-4 Hardware Installation Guide
- Preface
- About This Document
- Product Overview
- Preparing for Installation
- Mounting the Device
- Mounting options
- Mounting precautions
- Unpacking, transporting, and installing the device
- Installing the 8U Chassis Flush Mount Rack Kit for Four-Post Racks (XBR-RMK-FL-4)
- Four-Post Flush and Recessed Mount Intake Air Duct Rack Kit Installation (XBR-RMK-FL-4DS-2 and XBR-RMK-RE-4DS-2)
- Installing the 8U Chassis Flush and Mid-Mount Rack Kit for Two-Post Racks (XBR-RMK-TELCO-4)
- Initial Configuration
- Configuration overview
- Providing power to the device
- Establishing a serial connection to the device
- Logging in to the serial console port
- Assigning permanent passwords
- Configuring the IP addresses
- Logging off the serial console port and disconnecting the serial cable
- Establishing an Ethernet connection
- Customizing a host name
- Customizing a chassis name
- Setting the date and time
- Changing the RBridge ID and VCS ID
- Configuring operating modes on 27x40 GbE line cards
- Verifying correct operation
- Backing up a running configuration
- Connecting network devices
- Installing transceivers and attaching cables
- Managing cables
- System Monitoring
- Removal and Replacement Procedures
- Introduction
- ESD precautions
- Cable management comb removal and replacement
- Line card removal and replacement
- CFP2 to QSFP28 Conversion Module removal and replacement
- Management module removal and replacement
- Switch fabric module removal and replacement
- Power supply removal and replacement
- Fan removal and replacement
- Air filter removal and replacement
- Module filler panel removal and replacement
- Chassis ID card removal and replacement
- SFP transceiver removal and replacement
- QSFP transceiver removal and replacement
- Cable routing table
- Air filter removal and replacement
- ExtremeSwitching VDX 8770 Technical Specifications
- System specifications
- Ethernet
- LEDs
- Other
- Weight and physical dimensions
- Environmental requirements
- Power supply specifications (per PSU)
- Power consumption (typical configuration)
- Power consumption (maximum configuration)
- Power consumption (modules)
- Data port specifications (Ethernet)
- Serial port specifications (pinout RJ-45)
- Serial port specifications (protocol)
- Memory specifications
- Regulatory compliance (EMC)
- Regulatory compliance (safety)
- Regulatory compliance (environmental)
- Regulatory Statements
- Cautions and Danger Notices
3. Gently slide the device onto the rack, ensuring that it remains supported during the transfer. See the following gure.
FIGURE 14 Device installed in the rack
1. Screw locations
4. Secure the device to the equipment rack racks with six 10-32 x .63 screws, three screws on each side. See the previous gure.
5. Tighten the screws to a torque of 29.2 to 36.5 in-lb (33.6 to 42 cm-kg).
Installing the 8U Chassis Flush Mount Rack Kit for Four-Post Racks (XBR-RMK-FL-4)
ExtremeSwitching VDX 8770-4 Hardware Installation Guide
38 9036110-00