Installing the Virtual Services Platform 4450GSX-PWR+ 9035361 Rev.
© 2017-2018, Extreme Networks, Inc. All Rights Reserved. Notice While reasonable efforts have been made to ensure that the information in this document is complete and accurate at the time of printing, Extreme Networks, Inc. assumes no liability for any errors. Extreme Networks, Inc. reserves the right to make changes and corrections to the information in this document without the obligation to notify any person or organization of such changes.
including any code and software unless expressly authorized by Extreme Networks. Unauthorized reproduction, transmission, dissemination, storage, and or use without the express written consent of Extreme Networks can be a criminal, as well as a civil offense under the applicable law. Virtualization The following applies if the product is deployed on a virtual machine. Each product has its own ordering code and license types.
Contents Chapter 1: Preface.................................................................................................................... 6 Purpose.................................................................................................................................. 6 Training.................................................................................................................................. 6 Providing Feedback to Us.............................................................
Contents Front panel LEDs............................................................................................................ 35 Switch LED state indicators.............................................................................................. 35 Port LED state indicators................................................................................................. 36 Viewing hardware information...............................................................................................
Chapter 1: Preface Purpose This guide provides information and instructions to install the Extreme Networks Virtual Services Platform 4450GSX-PWR+ switch. Training Ongoing product training is available. For more information or to register, you can access the Web site at www.extremenetworks.com/education/.
Extreme Networks Documentation - Email: support@extremenetworks.com. To expedite your message, enter the product name or model number in the subject line. • GTAC Knowledge – Get on-demand and tested resolutions from the GTAC Knowledgebase, or create a help case if you need more guidance. • The Hub – A forum for Extreme customers to connect with one another, get questions answered, share ideas and feedback, and get problems solved.
Preface About this task You can modify your product selections at any time. Procedure 1. In an Internet browser, go to http://www.extremenetworks.com/support/service-notificationform/ . 2. Type your first and last name. 3. Type the name of your company. 4. Type your email address. 5. Type your job title. 6. Select the industry in which your company operates. 7. Confirm your geographic information is correct. 8. Select the products for which you would like to receive notifications. 9. Click Submit.
Chapter 2: New in this document The following sections detail what is new in Installing the Virtual Services Platform 4450GSX-PWR+. Transceiver support VSP Operating System software now allows the use of transceivers and direct attach cables from any vendor, which means that the switch will bring up the port operationally when using any transceiver. Extreme Networks does not provide support for operational issues related to the use of third party transceivers and direct attach cables used in the switches.
Chapter 3: Hardware models The following table describes the VSP 4450GSX series hardware. Table 1: Hardware VSP 4000 model Description Part number VSP 4450GSX-PWR+ • 12 10/100/1000 Mbps RJ45 ports with 802.
Platform power supplies Platform power supplies The VSP 4450GSX series supports both AC and DC power supplies. One power supply is installed in the system. You can install a redundant power supply to support additional power requirements or to provide power redundancy. The following table describes the VSP 4000 compatible AC and DC power supplies and their part numbers (order codes). All the power supplies are EUED RoHS 5/6 compliant.
Hardware models Table 4: Power cords for use with C14 or C16 power supply side connector Order Code Description Region AA0020071-E6 Power cord 2.5 m IEC C15 to BS1363 United Kingdom AA0020072-E6 Power cord 2.5 m IEC C15 to CEE 7/7 European Union AA0020073-E6 Power cord 2.5 m IEC C15 to JIS 8303 Japan AA0020074-E6 POWER CORD 2.0M IEC C15 TO NEMA 5-15P United States/Canada AA0020075-E6 Power cord 2.5 m IEC C15 to AS 3112 Australia AA0020097-E6 Power cord 2.
Supported optical devices For more information about SFP and SFP+ transceivers, including technical specifications and installation instructions, see Installing Transceivers and Optical Components on VSP Operating System Software. Compatible transceivers Important: Extreme Networks recommends using SFP and SFP+ transceivers as they have been through extensive qualification and testing. Extreme Networks will not be responsible for issues related to third party transceivers.
Chapter 4: Preinstallation checklist Before you install the VSP 4450GSX-PWR+and VSP 4450GSX-DC, make sure that you complete the tasks in the preinstallation checklist. No. Task Description 1. Review the technical specification for the switch. Make sure that the area where you install the switch and where it will operate meet the requirements. For the physical, electrical, and environmental specifications, see Technical specifications on page 19. 2. Verify the power supply unit (PSU) specifications.
No. Task Description Ensure that the rack is grounded to the same grounding electrode used by the power service in the area. The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode.
Chapter 5: Installing the VSP 4450GSXPWR+ series Installation checklist Use this checklist to install the VSP 4450GSX-PWR+and VSP 4450GSX-DC. No. Task Description 1. Install the VSP 4450GSX series. You can install the switch in two ways: • Installing the Virtual Services Platform 4000 on a table or shelf on page 22 • Installing the Virtual Services Platform 4000 in an equipment rack on page 23 2. Install the primary or redundant power supply.
Installation fundamentals 1. 12 10/100/1000 Mbps RJ45 ports with PoE+ 2. 36 100/1000 Mbps SFP ports 3. 2 1/10 Gbps SFP+ ports Figure 1: VSP 4450GSX-PWR+ 1. USB 2.0 port Note: The VSP 4450GSX-PWR+ model does not require a USB device in the USB port for normal operation. The USB port can be used for additional storage using USB memory stick. No log messages are generated when you plug or unplug the USB from the VSP 4450GSX-PWR+. 2. Switch LEDs 3. 10/100/1000BASE-T RJ45 ports with PoE+ (LEDs above ports) 4.
Installing the VSP 4450GSX-PWR+ series Note: The VSP 4450GSX-DC model does not require a USB device in the USB port for normal operation. The USB port can be used for additional storage using USB memory stick. No log messages are generated when you plug or unplug the USB from the VSP 4450GSX-DC. 2. Switch LEDs 3. 10/100/1000 Mbps RJ45 ports 4. 100/1000 Mbps SFP ports 5. 1/10Gbps SFP+ ports 6.
Technical specifications Preventing electrostatic damage in new cable installations With new cable installations, you are recommended to use an ESD discharge cable to reduce the potential for damage from static, that can build up in cables. The following figure illustrates an ESD cable. Figure 3: Job aid To install the ESD discharge cable, perform this procedure. 1. Connect the ground lug on the ESD discharge cable to a safe and suitable earth ground. 2.
Installing the VSP 4450GSX-PWR+ series Table 5: Physical specifications Specifications 4450GSX-PWR+ 4450GSX-DC Height 4.4 cm. – 1U 4.4 cm. – 1U Width 44 cm. 44 cm. Depth 43.6 cm. 43.68 cm. Weight 17.2lbs (7.80 kg) with 1 PSU installed. 17.2lbs (7.80 kg) with 1 PSU installed. A PSU weighs 3.1 lbs (1.40 kg) A PSU weighs 3.1 lbs (1.
Airflow direction Environmental requirement Virtual Services Platform 4000 models • Adequate clearance at the front and rear of the switch for access to cables. Warning: To avoid bodily injury from hazardous electrical shock and current, never remove the top of the device. No user-serviceable components are inside. For a translation of this statement, see Translations of safety messages on page 41.
Installing the VSP 4450GSX-PWR+ series Installing the Virtual Services Platform 4000 on a table or shelf You can install a single VSP 4000 switch on any flat surface. The surface must support the combined weight of the switch and attached cables (from 15 and 20 pounds [7 to 9 kilograms]). Note: A factory-supplied 4450GSX series switch has a USB port but no USB device or cover. To install a VSP 4000 on a table or shelf, perform the following procedure. 1.
Installing the Virtual Services Platform 4000 in an equipment rack Installing the Virtual Services Platform 4000 in an equipment rack To install an VSP 4000 switch in an equipment rack, perform this procedure. Note: A factory-supplied 4450GSX series switch has a USB port but no USB device or cover. Prerequisites for installing the VSP 4000 in an equipment rack: • Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an EIA or IEC-standard 19-inch (48.
Installing the VSP 4450GSX-PWR+ series 2. Slide the switch into the rack as illustrated. 3. Insert and tighten the rack-mount screws. Cable requirements for the Virtual Services Platform 4000 The following table describes the cables required for the VSP 4000 switch.
Installation and removal of Small Form Factor Pluggable (SFP) transceivers Table 7: Switch cable requirements Required Cable Description 10/100/1000BASE-T Ports The interconnect cabling must conform to the Cat5e, Cat6, or Cat6e specification of the Commercial Building Telecommunications Cabling Standard, ANSI/TIA/EIA 568-B fitted with an RJ45 Module jack.
Installing the VSP 4450GSX-PWR+ series 3. Grasp the transceiver between your thumb and forefinger. 4. Insert the transceiver into the proper module on the switch. Apply a light pressure to the transceiver until it clicks and locks into position in the module. 5. Remove the dust cover from the transceiver optical bores. Removing SFP transceivers Remove SFP transceivers by performing this procedure. 1. Disconnect the network fiber cable from the transceiver. 2.
Console port pin assignments Table 8: PWR+ RJ45 connector pin assignments Connector Pin Number Signal Description 1 RX+/power– Receive Data+/power– 2 RX–/power– Receive Data–/power– 3 TX+/power+ Transmit Data+/power+ 4 Not applicable Not applicable 5 Not applicable Not applicable 6 TX–/power+ Transmit Data–/power+ 7 Not applicable Not applicable 8 Not applicable Not applicable Important: The VSP 4000 PWR+ switches use pins 1, 2, 3, and 6 for PoE+, and is compliant with Type 2 (M
Installing the VSP 4450GSX-PWR+ series Table 10: RJ45 Console port pin assignments Connector Pin Number Signal 1 Ready to send (RTS) — optional 2 Data terminal ready (DTR) — optional, can swap or link with pin 8 3 Transmit data (TXD) — mandatory 4 Carrier detect (DCD) — optional 5 Ground (GND) — mandatory 6 Receive data (RXD) — mandatory 7 Data set ready (DSR) — optional 8 Clear to send (CTS) — optional, can swap or link with pin 1 Installing the Virtual Services Platform 4000 power supp
Installing the Virtual Services Platform 4000 power supply Note: Do not connect an AC and DC power supply in the same chassis. Load sharing may be affected. Important: You can hot swap power supplies while the switch is operational. One power supply is required for continued switch operation. PoE+ load reductions can occur if you remove one power supply while the switch is operating with dual power supplies.
Installing the VSP 4450GSX-PWR+ series Figure 5: IEC 60320 C16 connector Power over Ethernet Plus (PoE+) specifications Table 11: VSP 4450GSX-PWR+ PoE+ specifications Maximum PoE+ W Average PoE+ W on 12 ports 835W with one power supply 17.8W or 32.4W (802.3.at) — 1 power supply 1835W with two power supplies • The VSP 4450GSX-PWR+ can support 802.3af 17.8W or 32.4W on each port with one power supply installed. You can add a second power supply for redundancy.
Connect AC power Table 13: DC power supply specifications Description DC-DC-12V-300 W Output power 300 W Input voltage 48 V DC Input current 10 A Output voltage 12 V DC Output current 25 A Mean time between failures 293,000 hours The following table describes the regulatory DC power specifications for the VSP 4450GSX-DC switch. The regulatory DC power specifications are based on the maximum rated capacity of the power supplies and are not based on typical power consumption, which is lower.
Installing the VSP 4450GSX-PWR+ series Country and Plug Specification • Harmonized cord (HAR marking on the outside of the cord jacket to comply with the CENELEC Harmonized Document HD-21) Specifications United States of America, Canada, and Japan: • 100 or 120VAC • NEMA5-15P male plug • 50–60 Hz • UL-recognized (UL stamped on cord jacket) • Single phase Typical Plug • CSA-certified (CSA label secured to the cord) United Kingdom: • 240VAC • BS1363 male plug with fuse • 50 Hz • Harmonized cord
Connect AC power Figure 6: Connecting AC power to the rear panel Warning: Disconnecting the AC power cord is the only way to turn off AC power to the VSP 4000. Always connect the AC power cord in a quickly and safely accessible location in case of an emergency. For a translation of this statement, see Translations of safety messages on page 41. Caution: Before you unplug the AC power cord, always perform the following shutdown procedure. This procedure flushes any pending data to ensure data integrity. 1.
Installing the VSP 4450GSX-PWR+ series CP1 [03/24/14 18:39:06.000] LifeCycle: INFO: Stopping all processes CP1 [03/24/14 18:39:08.000] LifeCycle: INFO: All processes have stopped CP1 [03/24/14 18:39:08.
LED state definitions LED state definitions The figures and tables in the following sections describe the LEDs on the Virtual Services Platform 4000 Series switches. The tables describe LED operation for a switch that finishes the power-on self-test. Front panel LEDs The following diagram illustrates the components on the front panels of the VSP 4450GSX-PWR+ switch.
Installing the VSP 4450GSX-PWR+ series Note: Indicator states are applicable to all models of VSP 4000 switches. Table 16: Switch LED state indicators Label Color and Status Description PWR Green (solid) The switch is receiving power either from the primary or secondary power supply. Normal operation. Off The switch is not receiving power and not operating. Green (solid) • During start-up: The power-on self-test (POST) is complete and the switch is operating normally.
LED state definitions • Link indicates the presence of an Ethernet link. • Speed indicates the port speed (for example, 10 Mbps, 100 Mbps, 1000 Mbps). Table 17: RJ45 Port LED state indicators Label Color and Status Description Speed/PoE+ Green, Blink The port is set to operate at 1000 Mbps with PoE. Green, Steady The port is set to operate at 1000 Mbps without PoE +. Amber, Blink The port is set to operate at 100 Mbps with PoE+. Amber, Steady The port is set to operate at 100 Mbps without PoE +.
Installing the VSP 4450GSX-PWR+ series Note: When you remove an optic or a copper or fiber cable from Combo ports (47 and 48) in VSP 4850GTS or VSP 4850GTS-PWR, the port Link/Activity LEDs graphically represented in EDM do not reflect the correct LED status on the switch. The port Link/Activity LEDs in EDM remain solid green even after an automatic refresh of EDM. You must logout and login to EDM to see the correct LED status.
Viewing hardware information 29 Power Supply Info : Ps#1 Ps#1 Ps#1 Ps#1 Ps#1 Ps#1 Status : Type : Description : Serial Number: Version : Part Number : Ps#2 Status UP AC AC-DC-54V-1000W LBNNTMDT202R7H -325220-A.
Installing the VSP 4450GSX-PWR+ series Variable definitions Use data in the following table to use the show sys-info command. Variable Value card Displays information about the device. Includes type, serial number, and assembly date. fan Displays information about installed cooling ports. led Displays LED information in detail. power Displays information about installed power supplies. temperature Displays temperature information. uboot Displays uboot details.
Chapter 6: Translations of safety messages Caution: When you mount this device in a rack, do not stack units directly on top of one another. You must secure each unit to the rack with appropriate mounting brackets. Mounting brackets cannot support multiple units. Important: Achtung: Wenn diese Einheit in einem Rack montiert wird, muß ein gewisser Abstand zur nächsten Einheit gelassen werden. Jede Einheit muß mit geeignetem Befestigungsmaterial gesichert werden.
Translations of safety messages Caution: If you are not installing a module in the slot, be sure to keep the metal cover plate in place over the slot. Removing the cover plate impedes airflow and proper cooling of the unit. Important: Achtung: Wenn Sie kein Modul im Schacht verwenden, muß die Metallabdeckung über dem Schacht montiert sein. Eine Entfernung der Abdeckung führt zu einer Verschlechterung der Luftzirkulation und damit zu einer nicht ausreichenden Kühlung der Einheit.
Warning: Disconnecting the AC power cord is the only way to turn off AC power to this device. Always connect the AC power cord in a quickly and safely accessible location in case of an emergency. Important: Warnung: Das Gerät kann nur durch Ziehen des Netzsteckers ausgeschaltet werden. Schließen Sie das Netzkabel an einer Steckdose an, die in Notfällen schnell und sicher zugänglich ist.
Translations of safety messages Verwenden Sie nur Netzkabel mit Schutzerdung. Ohne ordnungsgemäße Schutzerdung besteht für Personen, die den Switch berühren, die Gefahr eines elektrischen Schlages. Eine nichtvorhandene Schutzerdung kann zu sehr starken Abstrahlungen führen. Danger: N'utilisez que des cordons d'alimentation équipés de trajet de mise à la terre. Sans mise à la terre adaptée, vous risquez de recevoir une décharge électrique en touchant le commutateur.
Important: 警告: 锂锂池不支持锂锂更锂, 只有授锂人锂才能锂行拆卸和更锂。 如果您需要更锂锂池,锂锂系 Extreme Networks 技锂支持部锂锂求帮助。 Important: Advertencia: La batería de litio no puede sustituirse en campo. La extracción y sustitución debe ser realizada exclusivamente por personal autorizado. Comuníquese con el Soporte técnico de Extreme Networks si necesita asistencia para cambiar la batería. Important: Aviso: A bateria de lítio não é substituível em campo. Só deve ser removida e substituída por pessoal autorizado.