Installing Virtual Services Platform 4850GTS Series 9035363 Rev.
© 2017-2018, Extreme Networks, Inc. All Rights Reserved. Notice While reasonable efforts have been made to ensure that the information in this document is complete and accurate at the time of printing, Extreme Networks, Inc. assumes no liability for any errors. Extreme Networks, Inc. reserves the right to make changes and corrections to the information in this document without the obligation to notify any person or organization of such changes.
including any code and software unless expressly authorized by Extreme Networks. Unauthorized reproduction, transmission, dissemination, storage, and or use without the express written consent of Extreme Networks can be a criminal, as well as a civil offense under the applicable law. Virtualization The following applies if the product is deployed on a virtual machine. Each product has its own ordering code and license types.
Contents Chapter 1: Preface.................................................................................................................... 6 Purpose.................................................................................................................................. 6 Training.................................................................................................................................. 6 Providing Feedback to Us.............................................................
Contents Connect power to the rear panel....................................................................................... 34 LED state definitions.............................................................................................................. 36 Front panel LEDs............................................................................................................ 36 Switch LED state indicators..........................................................................................
Chapter 1: Preface Purpose This guide provides information and instructions to install Extreme Networks Virtual Services Platform 4850GTS switch. Training Ongoing product training is available. For more information or to register, you can access the Web site at www.extremenetworks.com/education/.
Extreme Networks Documentation - Email: support@extremenetworks.com. To expedite your message, enter the product name or model number in the subject line. • GTAC Knowledge – Get on-demand and tested resolutions from the GTAC Knowledgebase, or create a help case if you need more guidance. • The Hub – A forum for Extreme customers to connect with one another, get questions answered, share ideas and feedback, and get problems solved.
Preface About this task You can modify your product selections at any time. Procedure 1. In an Internet browser, go to http://www.extremenetworks.com/support/service-notificationform/ . 2. Type your first and last name. 3. Type the name of your company. 4. Type your email address. 5. Type your job title. 6. Select the industry in which your company operates. 7. Confirm your geographic information is correct. 8. Select the products for which you would like to receive notifications. 9. Click Submit.
Chapter 2: New in this document There are no feature-related changes for this release in Installing the Virtual Services Platform 4850GTS Series.
Chapter 3: Hardware models for VSP 4850GTS Series The following table describes the VSP 4850GTS Series hardware. Table 1: Hardware VSP 4000 model Description Part number VSP 4850GTS • 48 10/100/1000 Mbps RJ45 ports EC4800A78-E6 • 2 Combo 100/1000 Mbps ports • 2 1/10 Gbps SFP+ ports • Base Software License • one (of two) field replaceable 300W PSUs supplied with the chassis VSP 4850GTS-PWR+ • 48 10/100/1000 Mbps 802.
VSP 4000 power supplies VSP 4000 power supplies The VSP 4000 supports both AC and DC power supplies. One power supply is installed in the system. You can install a redundant power supply to support additional power requirements or to provide power redundancy. The following table describes the VSP 4000-compatible AC and DC power supplies and their part numbers (order codes). All the power supplies are EUED RoHS 5/6 compliant.
Hardware models for VSP 4850GTS Series Table 3: Power cords for power distribution units Order Code Length Power supply side connector Power source side connector Safety Approval 700512240 3m C15 C14 USA 700512242 3m C15 C14 International except Japan and Taiwan Table 4: Power cords for use with C14 or C16 power supply side connector Order Code Description Region AA0020071-E6 Power cord 2.5 m IEC C15 to BS1363 United Kingdom AA0020072-E6 Power cord 2.
Supported optical devices Important: The attainable cable length can vary depending on the quality of the fiber-optic cable used. Small Form Factor Pluggable plus (SFP+) transceivers SFP+ transceivers are hot-swappable input and output enhancement components that allow 10 gigabit connections. All Extreme Networks SFP+ transceivers use Lucent connectors (LC) to provide precision keying and low interface losses.
Chapter 4: Preinstallation checklist Before you install the VSP 4850GTS, VSP 4850GTS-DC, and VSP 4850GTS-PWR+, make sure that you complete the tasks in the preinstallation checklist. No. Task Description 1. Review the technical specification for the switch. Make sure that the area where you install the switch and where it will operate meet the requirements. For the physical, electrical, and environmental specifications, see Technical specifications on page 20. 2.
No. Task Description Ensure that the rack is grounded to the same grounding electrode used by the power service in the area. The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode.
Chapter 5: Installing the VSP 4000 4850GTS Series Installation checklist Use this checklist to install the VSP 4850GTS series. No. Task Description 1. Install the VSP 4850GTS series. You can install the switch in two ways: • Installing the Virtual Services Platform 4000 on a table or shelf on page 23 • Installing the Virtual Services Platform 4000 in an equipment rack on page 24 2. Install the primary or redundant power supply.
Installation fundamentals VSP 4850GTS series models The VSP 4850GTS series models consist of: • 48 10/100/1000 Mbps ports - RJ45 for the VSP 4850GTS and VSP 4850GTS DC models - 802.3at PoE+ for the VSP 4850GTS-PWR+ model • Two Combo 1000/1000 Mbps SFP ports - These ports support copper and fiber on the same switch port. Only one medium type can be active at any time. - There is an RJ45 connector and an SFP slot for each Combo port. A cable can be inserted into either or both medium types.
Installing the VSP 4000 4850GTS Series Figure 2: VSP 4850GTS-PWR+ 1. VSP 4000 USB device with USB device cover Caution: To ensure proper operation, the USB FLASH drive must remain inserted in all models of VSP 4850 (factory built and converted from ERS 4850), with the cover installed for additional protection against removal. The USB FLASH drive on the VSP 4850 switch is uniquely bound to the system it was first used on and cannot be transferred to a different switch. 2. Switch LEDs 3.
Electrostatic discharge USB considerations for factory supplied and converted VSP 4000 switches Warning: The USB FLASH drive on all models of VSP 4850 (factory built and converted from ERS 4850) must be treated as a permanent non-removable part of the switch and must NEVER be removed from the switch to ensure proper operation. Additionally, the USB cover must be installed to ensure additional protection against removal.
Installing the VSP 4000 4850GTS Series • Avoid contact between equipment and clothing. The wrist or ankle strap protects only the equipment from ESD voltages on the body; ESD voltages on clothing can still cause damage. • Avoid touching any connector pins. • Do not remove the wrist or ankle strap until the installation is complete.
Environmental requirements Warning: To avoid bodily injury from hazardous electrical shock and current, never remove the top of the device. No user-serviceable components are inside. Table 5: Physical specifications Specifications 4850GTS 4850GTS-DC 4850GTS-PWR+ Height 4.4 cm. – 1RU 4.4 cm. – 1RU 4.4 cm. – 1RU Width 44 cm. 44 cm. 44 cm. Depth 43.68 cm. 43.68 cm. 43.68 cm. Weight 11.48 Kg 11.48 Kg 11.
Installing the VSP 4000 4850GTS Series Environmental requirement Virtual Services Platform 4000 models • An adequate power source is within 6 feet (1.83 meters) of the switch. One 15-amp circuit is required for each power supply. • At least 2 inches (5.08 centimeters) of clearance on each side of the switch unit for ventilation. • Adequate clearance at the front and rear of the switch for access to cables.
Installing the Virtual Services Platform 4000 on a table or shelf Note: Cable trays can be provided as an option. Note: Power cords must be ordered separately. Ensure you order the correct power code for your region. For more information, see Power cord types and order codes on page 11. Installing the Virtual Services Platform 4000 on a table or shelf You can install a single VSP 4000 switch on any flat surface.
Installing the VSP 4000 4850GTS Series 3. Set the switch on a table or shelf as illustrated below. Allow at least 2 inches (5.1 centimeters) on each side for proper ventilation and at least 5 inches (12.7 centimeters) at the back for power cord clearance. Installing the Virtual Services Platform 4000 in an equipment rack To install an VSP 4000 switch in an equipment rack, perform this procedure.
Installing the Virtual Services Platform 4000 in an equipment rack Prerequisites for installing the Virtual Services Platform 4000 in an equipment rack: • Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack. • The rack is bolted to the floor and braced if necessary. • The rack is grounded to the same grounding electrode used by the power service in the area.
Installing the VSP 4000 4850GTS Series 4. Insert and tighten the rack-mount screws. Cable requirements for the Virtual Services Platform 4000 The following table describes the cables required for the VSP 4000 switch. Table 7: Switch cable requirements Required Cable Description 10/100/1000BASE-T Ports The interconnect cabling must conform to the Cat5e, Cat6, or Cat6e specification of the Commercial Building Telecommunications Cabling Standard, ANSI/TIA/EIA 568-B fitted with an RJ45 Module jack.
Installation and removal of Small Form Factor Pluggable (SFP) transceivers Required Cable Description Note: 100BASE-FX Transceivers are supported in SFP ports only, and not in SFP+ ports. Console Port Varies depending on the user device. The VSP 4000 has an RJ45 female connector, so a serial cable with RJ45 connectors, or a serial cable with a DB-9 female connector on one end and an RJ45 on the other is appropriate. The maximum length for the console port cable is 25 feet (8.3 meters).
Installing the VSP 4000 4850GTS Series 3. Slide the transceiver from the module slot. 4. If the transceiver does not slide easily from the module slot, use a gentle side-to-side rocking motion while firmly pulling the transceiver from the slot. 5. Attach a dust cover over the fiber-optic bores and store the transceiver in a safe place until you need it. Important: Discard transceivers in accordance with the proper laws and regulations.
Console port pin assignments Important: The VSP 4000 PWR+ models use pins 1, 2, 3, and 6 for PoE+, and is compliant with Type 2 (MDI-X) in IEEE802.3at. Console port pin assignments The following table describes the console port pin assignments in the VSP 4000. Important: VSP 4000 supports only CLI Quickstart use on the console port.
Installing the VSP 4000 4850GTS Series Installing the Virtual Services Platform 4000 power supply You must install at least one power supply before using the switch. VSP 4000 models support two field replaceable external power supplies. If supported, you can install an optional second power supply for redundancy, load sharing, or to provide additional PoE+ power budget. About this task Perform the following procedure to install an external power supply into your switch. Note: VSP 4000 hardware can vary.
Installing the Virtual Services Platform 4000 power supply VSP 4000 power supply power specification The VSP 4000 supports two external field-replaceable power supplies. One power supply ships with the chassis. You can install a secondary power supply to provide redundancy and load sharing, and to add Power over Ethernet Plus (PoE+) power budget on PWR+ models. 300 W AC power supply The VSP 4850GTS supports 300 W AC power supplies.
Installing the VSP 4000 4850GTS Series Power over Ethernet Plus specifications Table 11: VSP 4850GTS and 4850GTS-PWR+ models Maximum PoE+ W Average PoE+ W on 50 port model 855 W with one power supply 15.4 W (802.3af) 1855 W with two power supplies 17.8 W (802.3.at) — One power supply 32.4 W (802.3at) — Two power supplies • VSP 4850GTS-PWR+ can support 802.3af 15.4 W on each port with one power supply installed. You can add a second power supply for redundancy. • VSP 4850GTS-PWR+ can support 802.
Connect AC power Table 14: DC power supply specifications Specifications 4850GTS-DC Output power 300 W Input voltage 48 V DC Input current 10 A Output voltage 12 V DC Output current 25 A Connect AC power This section explains power cord specifications and how to connect AC power. Power cord specifications To connect AC power to the switch, you need an appropriate AC power cord as described in the following table, also see the following table for plug specifications.
Installing the VSP 4000 4850GTS Series Danger: Using power cords with a proper grounding path Use only power cords that have a grounding path. Without a proper ground, a person who touches the switch is in danger of receiving an electrical shock. Lack of a grounding path to the switch can result in excessive emissions. For a translation of this statement, see Translations of safety messages on page 43.
Connect AC power Caution: Before you unplug the AC power cord, always perform the following shutdown procedure. This procedure flushes any pending data to ensure data integrity. 1. Enter the Privileged EXEC command mode: enable 2. Shutdown the VSP 4000: sys shutdown 3. When prompted, enter y to confirm system shut down. 4. Before you unplug the power cord, wait until you see the following message: System Halted, OK to turn off power.
Installing the VSP 4000 4850GTS Series Stopping syslogd/klogd: no syslogd found; none killed Sending all processes the TERM signal... Sending all processes the KILL signal... hwclock: can't open '/dev/misc/rtc': No such file or directory /etc/rc0.d/S25save-rtc.sh: line 5: /etc/timestamp: Read-only file system Unmounting remote filesystems... Stopping portmap daemon: portmap. Deactivating swap... Unmounting local filesystems... [695413.959234] Power down. [695413.
LED state definitions Figure 7: VSP 4850GTS 1. VSP 4000 USB drive with USB cover 2. Switch LEDs 3. 10/100/1000 Mbps ports (LEDs above ports) 4. Combo 100/1000 Mbps SFP slots. Supports Extreme Networks1 Gbps SFPs and 100 Mbps low-speed SFPs. 5. 1/10 Gbps SFP+ slots. Supports Extreme Networks 1 Gbps SFPs and 10 Gbps SFP+s. 6. Console port Figure 8: VSP 4850GTS-PWR+ 1. VSP 4000 USB drive with USB cover 2. Switch LEDs 3. 10/100/1000 Mbps PoE+ ports (LEDs above ports) 4. Combo 100/1000 Mbps SFP slots.
Installing the VSP 4000 4850GTS Series Related links LED state definitions on page 36 Switch LED state indicators The following table describes the main switch LED state indications provided by LED color and fluctuation cues. Note: Indicator states are applicable to all models of VSP 4000 switches. Table 16: Switch LED state indicators Label Color and Status Description PWR Green (solid) The switch is receiving power either from the primary or secondary power supply. Normal operation.
LED state definitions Related links LED state definitions on page 36 Port LED state indicators This section describes the port LED state indicators by color and fluctuation cues. Note: Indicator states are applicable to all models of VSP 4000 switches. The following list describes the three port LEDs: • Activity indicates the level of activity on the link. • Link indicates the presence of an Ethernet link. • Speed indicates the port speed (for example, 10 Mbps, 100 Mbps, 1000 Mbps).
Installing the VSP 4000 4850GTS Series Label Link / Activity Color and Status Description Amber, Steady SFP Installed—TX Port Inactive Off No SFP transceiver is present. Green, Blink Activity exists on the port. Green, Slow Blink Software disabled this port. Green, Steady The link is operating normally. Off No link exists.
Viewing hardware information Example Viewing hardware information on VSP 4850GTS-PWR+ switch: VSP-4850GTS-PWR+:1>show sys-info General Info : SysDescr SysName SysUpTime SysContact SysLocation : : : : : VSP-4850GTS-PWR+ (w.x.y.z) HW Base: ERS 4850 VSP-4850GTS-PWR+ 0 day(s), 00:04:19 http://www.extremenetworks.com/contact/ 9 Northeastern Blvd,Salem,NH.
Installing the VSP 4000 4850GTS Series LED#5 Label : Down LED#5 Status : UnSupported LED#6 Label : Base LED#6 Status : UnSupported USB Info : Vendor Id Manufacturer Product Id Product Name Rev Serial Number Max Current : : : : : : : 196d InnoDisk 0201 Nano 02.
Chapter 6: Translations of safety messages Caution: When you mount this device in a rack, do not stack units directly on top of one another. You must secure each unit to the rack with appropriate mounting brackets. Mounting brackets cannot support multiple units. Important: Achtung: Wenn diese Einheit in einem Rack montiert wird, muß ein gewisser Abstand zur nächsten Einheit gelassen werden. Jede Einheit muß mit geeignetem Befestigungsmaterial gesichert werden.
Translations of safety messages Caution: If you are not installing a module in the slot, be sure to keep the metal cover plate in place over the slot. Removing the cover plate impedes airflow and proper cooling of the unit. Important: Achtung: Wenn Sie kein Modul im Schacht verwenden, muß die Metallabdeckung über dem Schacht montiert sein. Eine Entfernung der Abdeckung führt zu einer Verschlechterung der Luftzirkulation und damit zu einer nicht ausreichenden Kühlung der Einheit.
Warning: Disconnecting the AC power cord is the only way to turn off AC power to this device. Always connect the AC power cord in a quickly and safely accessible location in case of an emergency. Important: Warnung: Das Gerät kann nur durch Ziehen des Netzsteckers ausgeschaltet werden. Schließen Sie das Netzkabel an einer Steckdose an, die in Notfällen schnell und sicher zugänglich ist.
Translations of safety messages Verwenden Sie nur Netzkabel mit Schutzerdung. Ohne ordnungsgemäße Schutzerdung besteht für Personen, die den Switch berühren, die Gefahr eines elektrischen Schlages. Eine nichtvorhandene Schutzerdung kann zu sehr starken Abstrahlungen führen. Danger: N'utilisez que des cordons d'alimentation équipés de trajet de mise à la terre. Sans mise à la terre adaptée, vous risquez de recevoir une décharge électrique en touchant le commutateur.
Important: 警告: 锂锂池不支持锂锂更锂, 只有授锂人锂才能锂行拆卸和更锂。 如果您需要更锂锂池,锂锂系 Extreme Networks 技锂支持部锂锂求帮助。 Important: Advertencia: La batería de litio no puede sustituirse en campo. La extracción y sustitución debe ser realizada exclusivamente por personal autorizado. Comuníquese con el Soporte técnico de Extreme Networks si necesita asistencia para cambiar la batería. Important: Aviso: A bateria de lítio não é substituível em campo. Só deve ser removida e substituída por pessoal autorizado.