Installation Instructions
Table Of Contents
- Contents
- Chapter 1: About this Document
- Chapter 2: New in This Document
- Chapter 3: Hardware Models for VSP 7200 Series
- Chapter 4: Preinstallation Checklist
- Chapter 5: Installing the Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Install a Fan Module
- LED state definitions
- Installing the switch in an equipment rack
- Cable Requirements for the VSP 7200 Series
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- MACsec operational notes
- Viewing hardware information
- Chapter 6: Translations of safety messages
Figure 6: Shipping components
Rails
The following figure shows a slide rail in the default configuration for a 300mm-600mm equipment
rack. This configuration comes with the short rear bracket installed. The slide rail actually consists of
two separate rails that slide into each other:
• Rack rail—This rail is the main component that connects to the equipment rack.
• Chassis rail—This rail is embedded in the rack rail. Later, the installation instructions explain
how to detach these two rails and install the chassis rail onto your switch.
Installing the Virtual Services Platform 7200 Series
March 2020 Installing the VSP 7200 Series 42