Installation Instructions
Table Of Contents
- Contents
- Chapter 1: About this Document
- Chapter 2: New in This Document
- Chapter 3: Hardware Models for VSP 7200 Series
- Chapter 4: Preinstallation Checklist
- Chapter 5: Installing the Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Install a Fan Module
- LED state definitions
- Installing the switch in an equipment rack
- Cable Requirements for the VSP 7200 Series
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- MACsec operational notes
- Viewing hardware information
- Chapter 6: Translations of safety messages
Important notice about rack safety
One prerequisite to installing the switch in an equipment rack is to bolt the equipment rack to the
floor.
Warning:
If you pull the chassis all the way out on the slide rails, there is a danger of the rack tipping over
if the rack is not bolted to the floor. This can happen even if there are other devices installed in
your equipment rack.
Removing the switch from an equipment rack
Follow these steps if you have to remove the switch from an equipment rack.
Important:
This procedure requires two people.
Procedure
1. Disconnect the power cord from the switch.
2. Slide the switch out until the lock engages.
3. While the person standing in back of the chassis slides both of the white release locks (one
on each side of the chassis) towards the front, the person standing in front of the chassis
Installing the Virtual Services Platform 7200 Series
March 2020 Installing the VSP 7200 Series 70