Installation Instructions
Table Of Contents
- Contents
- Chapter 1: About this Document
- Chapter 2: New in This Document
- Chapter 3: Hardware Models for VSP 7200 Series
- Chapter 4: Preinstallation Checklist
- Chapter 5: Installing the Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Install a Fan Module
- LED state definitions
- Installing the switch in an equipment rack
- Cable Requirements for the VSP 7200 Series
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- MACsec operational notes
- Viewing hardware information
- Chapter 6: Translations of safety messages
2. Attach a bracket to each side of the switch using a #2 Phillips screwdriver as illustrated
below.
3. Slide the switch onto a shelf or tray in the rack.
4. Insert and tighten the rack-mount screws.
5. Verify that the switch is securely fastened to the rack.
6. Connect power and network connections to the switch.
Installing the Virtual Services Platform 7200 Series
March 2020 Installing the VSP 7200 Series 72