Installation Instructions
Table Of Contents
- Contents
- Chapter 1: About this Document
- Chapter 2: New in this document
- Chapter 3: Hardware fundamentals
- Hardware Component Specifications and Part Numbers
- VSP 8608 chassis
- Cooling modules
- IOC Modules
- Switch fabric modules
- Pluggable transceivers and DACs
- AC and DC power supply fundamentals
- Power calculator tool
- Console port pin assignments
- Airflow direction
- Status LEDs
- Cable requirements
- Electrostatic Discharge Preventative Measures
- Package contents
- Chapter 4: Technical specifications
- Chapter 5: Preinstallation checklist
- Chapter 6: Install the Switch and the Components
- Chapter 7: Replace Components
- Chapter 8: Translations of safety messages
- Definitions of Safety Symbols
- Electric shock voltage statement
- Electric shock multiple cord danger statement
- Use power cords with grounding path danger statement
- Cooling module fan safety danger statement
- Laser eye safety danger statement
- Laser eye safety connector inspection danger statement
- Connector cleaning safety danger statement
- Electrostatic discharge warning statement
- Ensure adequate power source when using a single PSU
- Disconnect power cord caution statement
- Class A electromagnetic interference warning statement
- Optical fiber damage warning statement
- Optical fiber connector damage warning statement
- Transceiver damage warning statement
- Stacking devices warning statement
- Empty cooling module bay warning statement
- Empty module slot warning statement
- Appendix A: Regulatory and Compliance Information
- Federal Communications Commission (FCC) Notice
- Industry Canada Notice
- Class A ITE Notice
- Klasse A ITE Anmerkung
- Product Safety
- Produktsicherheit
- Korea EMC Statement
- Electromagnetic Compatibility (EMC)
- Elektro-magnetische Kompatibilität (EMC)
- VCCI Notice
- BSMI EMC Statement — Taiwan
- CCC EMC Statement — China
- Battery Warning — Taiwan
- Battery Notice
- Restriction of Hazardous Substances
- Hazardous Substances
- European Waste Electrical and Electronic Equipment (WEEE) Notice
- Safety
No. Task Description
3 Install the IOC and switch fabric
modules.
See Installing an IOC or SF module on page 48.
4 Install the power supplies. If you have AC power supplies, see Installing an AC
power supply on page 55 and Connecting an AC
power supply on page 57.
If you have DC power supplies, see Installing a DC
power supply on page 60.
For more information, see
AC and DC Power Supply
Specifications on page 38.
5 Install the power supply cover and
cable management tray.
See Installing the power supply cover and cable
management tray on page 53.
6 Check the LEDs to verify the
installation.
For information about the various LED states, see
Status LEDs on page 29.
Installing the chassis in an equipment rack
Use the following procedure to install the chassis in a two-post or four-post equipment rack.
Before you begin
Acquire the following items:
• Clips to attach the chassis in the rack
• Phillips #2 screwdriver
• Before lifting the chassis, ensure the following:
- Reduce the weight of the chassis as much as possible before you lift it.
- Use a mechanical lift when one is available or use a shelf.
- Ensure you have at least two people to lift the chassis.
- Lift the chassis from the bottom.
About this task
The chassis can be installed in any standard 19–inch (48 cm) deep two-post or four-post equipment
rack in a flush-mount configuration.
Tip:
If you use the cable management tray, ensure you leave space in the rack above the chassis to
accommodate the tray.
Procedure
1. Determine where you want to install the chassis in the rack, and attach the clips.
Installing the chassis in an equipment rack
December 2021 Installing the VSP 8600 47