User's Manual

IPL T S Series Interfaces • Software Setup
3-19
12. Click Next again to add an e-mail notication.
13. Select an e-mail message and contacts, and click
Apply Email/Contacts.
14. Click Done. The dialog box closes.
Building and Uploading a GC File
Before a Global Conguration (GC) le is active in the
GlobalViewer interface, the GC le must be “built” and
“uploaded” to a GlobalViewer host device.
The “build” process compiles all of the conguration data you
have entered into the GC le for each A/V network device.
The “upload” process delivers the built (compiled) le to the
GlobalViewer host device.
After the GC le has been uploaded to a host device, you can
launch the GlobalViewer interface by entering the host device’s
IP address in the address eld of an Internet browser.
Step eleven: build the Global Configurator file
There are two Build commands:
• BuildAllConfigurations— compiles conguration data
for all devices in the GC le, including data for devices
previously uploaded to a GlobalViewer host device.
• BuildChangedConfigurations — compiles conguration
data only for devices that have been added or changed since
the previous Build cycle.
To initiate a "Build (all)” process:
1. Click Build > Build All Configurations...
or
click the Build All Configurations icon.
A Please Wait. Building Conguration(s)... dialog box
opens and displays a progress bar while the GC le is
being built.