Installation User Manual
Preparing the
Table
This section includes the following topics:
z Installation Overview
z Cutout Dimensions
TLP 350CV • Prepare the Table 5
Installation Overview
Planning
z Determine the optimum furniture location for the TLP 350CV keeping in mind the
following:
z the size of the enclosure that will be below the table,
z the orientation of the touch-screen for ease of viewing,
z the reach distance for a user for convenient operation,
z clearances for under-table cabling,
z the location of devices that may be connected to the AAPs both under and on top
of the furniture.
z Obtain the proper cutout dimensions or a router template for the craftsman cutting the
enclosure opening in the furniture,
z Determine the number and type of AAPs required by the installation.
Prepare the Cable Cubby enclosure
z Install the power module,
z Assemble the pass-through AAPs, install cables, and if applicable install passive AAPs.
Loosely fasten all AAPs to the AAP shelf.
z Install the AAP shelf assembly into the Cable Cubby enclosure and tighten all AAPs.
Install the Enclosure
z Mount the TLP 350CV into the furniture opening,
z Mount and connect the power supply to the TLP 350CV,
z Connect a LAN,
z If using the video monitoring capabilities, make all video input connections,
z Apply power and follow the on-screen instructions to set up the TLP 350CV for first time
operation.