User guide
5. The project can be uploaded to one or more TouchLink panels. To add a panel:
a. From the Project menu, select Add > Panel:
Figure 32. Add a TouchLink Panel (a)
b. The Panel Manager dialog box opens:
Figure 33. Add a TouchLink Panel (b)
c. Click the Add Panel icon to add a new panel to the left pane.
d. Highlight the name of the panel in the left pane to display the
properties of that panel in the right pane.
e. When a new panel is added, it is assigned the default IP address
(192.168.254.254). To change the IP address, highlight the address property in
the right pane and type in the correct IP address. Update any other properties, as
required.
f. Repeat steps 5c - 5e to add further panels, if required.
6. Upload a project to a TouchLink panel as follows:
a. From the Project menu, select Upload to Selected Panels. The
Build Manager dialog box opens, showing the build progress. After the build is
complete, this dialog box closes and the File Upload Manager screen opens. The
upload begins automatically.
b. Select Close this dialog when upload completes check box in
the Automatic Settings section so that the File Upload Manager screen closes
automatically when the upload completes. This option can be set before or during
the upload.
TLP 710MV and TLP 710TV • Conguration Software 28