Installation Guide

4
Item Installation Kit Quantity
[pcs]
1 Stainless Steel Wing Bracket
(Secures support Notched Beams to posts)
4
2 Stainless Steel Load Plate
(Supports beams and wing bracket)
4
3 Screw #12 1 1/2” Philips Pan Head
(Secures Load Plate to post)
4
4 Screw #14 x 3/4” Hex Head Self Drilling Screw
(Secures Notched Beams to Wing Bracket)
16
5 Screw #8 x 1 1/2” Philips Flat Head Wood Screw
(Secures Column and Stone Base metal brackets to wood support post)
32
6 Screw #8 x 1 1/2” Philips Pan Head
(Secures Wing Bracket to posts)
48
7 Construction Grade Adhesive 1
Materials Required:
1. Four 4" × 4" wood support posts 10’ or longer (* Length depends on installation method)
2. Four 4" × 4" galvanized metal support post fasteners for pier installation method. (Wood
screws, wedge anchors, bolts, and masonry and wood drill bits)
3. Exterior construction grade silicone sealant
4. 80 lb. ready to mix concrete (approximately 2 bags per pier)
Tools Required:
Tape measure Drill Trowel / Float Caulk gun
Level Hand / Power saw Socket wrench set Bucket / Hose
Ladders Screwdriver set Hammer Post hole digger
String or chalk line Wheelbarrow Carpenter pencil Shovel
Carpenter Square Clamps Drill Bits
Parts and Materials List
Version 3.0, March 2010