Instructions / Assembly
Page 40 of 74 
4.9.12.  Insert adjustable elbows into the open ramp handrail, the Bolt-On Stub Rail and the 
open ends of the welded handrail extension (FIG. 4.20). 
4.9.13.  Align the adjustable elbows and measure and cut the 1-1/2β diameter handrail tubes 
connecting the ramp handrail and Bolt-On Stub Rail to the handrail extension. 
Measure both upper and lower gaps because they could be different and cut tubes 
accordingly. The procedure for installing the 1-1/2β diameter handrail tubes and 
adjustable elbows is the same as the installing the closure top rail, refer βCLOSURESβ 
section. 
4.9.14.  FIG. 4.20 shows the completed connection. 
4.9.15.  Make sure all fasteners on both sides are tightened securely. 
FIG. 4.20 










