Instructions / Assembly
1 
PATHWAY
®
 3G Modular Access System Assembly Manual  Page 38 of 77 
4.4.3.
For the “second” handrail in a turn configuration, only assemble one angle post as described 
above, paying attention to how it will connect to the “first” handrail so the angle post will be 
oriented correctly. 
4.4.4.
For straight platform configurations and the “first” handrail on a turn platform, drop 
platform handrails into the corner pockets (FIG. 4.8). The curb should rest on top of the 
corner pocket when installing the Two-Line handrails. For the Vertical Picket handrails, align 
the bottom of the post with the bottom of the platform corner pockets. 
4.4.5.
For the “second” handrail on a turn platform, insert the angle post into a corner pocket at 90 
degrees from the “first” handrail, then install 5/16”-18 x 1” long hex bolt through a 5/16” flat 
washer, the angle post in the “first” handrail, and into a 5/16”-18 threaded inserts in the 
“second” handrail, curb, or picket (FIG. 4.8). Tighten all fasteners securely. 
4.4.6.
Tighten two set screws on the inside of each platform corner pocket. One setscrew is located 
above the platform deck and the other is underneath (FIG. 4.7). 
4.4.7.
Install an angle cap on top of each handrail post. Use construction adhesive to bond the cap 
in place (FIGs. 4.4, 4.5, and 4.6). 
4.4.8.
Ensure all fasteners are tightened securely. 
FIG. 4.7 
FIG. 4.8 










