Full Product Manual

1
PATHWAY
®
3G Modular Access System Assembly Manual Page 19 of 77
2.6.5.3.
Set the ramp on the hangers, ensuring that the hangers are positioned as close as
possible to the ramp side rails (FIG. 2.14). The procedure is the same at both the
top and bottom of ramp runs which end at a platform unless a low profile ground
or bridge transition is used.
Do not attempt to walk on system until installation is complete.
2.6.5.4.
Proceed with the system installation. Secure all ramps to platforms as described in
the SECURE RAMPS TO PLATFORMS section as part of the final steps and checks.
FIG. 2.14