Installation Guide

© EZ-ACCESS, a division of Homecare Products, Inc. All rights reserved. All text and images contained on this document are proprietary and may not be
shared, modified, distributed, reproduced, or used without the express written permission of EZ-ACCESS.
4076
Environmental Survey
PATHWAY
®
HD Code Compliant Modular Access System
Ramp Requirements Worksheet
Customer ID
Phone
Today’s Date
Contact Name
Contact Email
Site Address
City
State
Delivery
Required Delivery Date
Lift gate Delivery appt. Residential Expedited Limited access
Drawing Options
Is this an existing building?
Canned Non-stamped/Footing layout Stamped Seismic/wind calculations Yes No
Entry Diagram Measurements
Width of Steps
(or between handrails, if applicable)
A = ________
Depth of Steps B = ________
Rise of Steps C = ________
Width of Entrance (if differs from steps) D = ________
Rise of Entrance (if differs from steps) E = ________
Depth of Entrance F = ________
Width of Door (usable space) G = ________
Rise of Exterior Threshold
Threshold ramp needed
H = ________
Rise of Interior Threshold
Threshold ramp needed
I = ________
Depth of Threshold J = ________
Calculating Total Rise
All measurements that do not apply to the entry are to be give a value of zero.
Rise of Exterior Threshold
H =
________
As you face outside, the door opens
In Out
Initial Rise of Steps/Entry
+ C or E =
________
Left Right
Grade Variation (if any)*
+ or - =
________
At 36” of rise and above, bracing is needed
At 72” and above, additional bracing is needed
Bracing
Additional bracing
Total Rise
=
________
* Any ground variations should be added (decline) or subtracted (incline) from the total rise.

Summary of content (3 pages)