Instructions / Assembly

Lay out base.
Assemble floor poles, straight connectors
and 3-way corners as shown.
Insert wall poles into 3-way corners.
Fit 3-way corners on top.
Insert ceiling poles into strait connectors and 3-way corners.
Fit equipment hanger ends to poles.
Position equipment hangers as required.
Equipment
Hanger End
3-Way Corner
3-Way Corner
Fit left side of tent over frame as shown.
Step 1
Step 2
Step 3
Step 4
Straight Connector
Straight Connector