Product Brochure

Step by step Instructions
Step 1
Measure and cut the (A) 2x2" Open Back boom AND (A) 2x2"
Midrail to t rmly between your vertical posts or walls. Using wood
or concrete screws, fasten ONLY the 2x2" boom rail along the oor
with the open side up. IMPORTANT – Make sure the spline groove is
facing the desired direction. We recommend facing the screen in for
elevated enclosures.
Step 2
BEFORE cuing the two pieces of the (B) Railing Snap, align the end
holes equidistant from each vertical post or wall. en cut equal
amounts from both ends of each Railing Snap so the pieces t with
uniform hole spacing in opening. *Ensure holes align for both pieces.
Step 3
Align (C) 1" Sq. Balusters holes to
predrilled holes on the smooth side of
(B) Railing Snap. Fasten each baluster
with two 1.5" SMS fasteners. Continue
fastening all necessary balusters.
Step 4
Repeat Step 3 at the other end of
the (C) “1" Sq. Balusters” to create
your railing section
Step 5
Snap railing section into secured
(A) 2x2" Boom Rail.
Step 6
Snap (A) 2x2" Top Rail onto railing
assembly. IMPORTANT: make sure that
the spline grooves face the same
direction (diagram A).
Step 7
Secure top rail to existing posts
or walls with (D) Capri Clips and
(F) ¾" Self Drilling Fasteners.
Overview:
is instruction set shows the fabrication of the integrat-
ed railing portion of your screen enclosure. Additional
steps are necessary for a complete screen enclosure.
Parts:
A. (2) 2x2" Open back (top and boom rails)
B. (2) Railing snap (top and boom rails)
C. (20) 1" Square Balusters per 8’ .
D. (2) Capri Clips
E. (4) 1.5" Fasteners per baluster
F (8) ¾" Self Drilling Fasteners
Kits come in 8' lengths
A
B
C
DEF
A
B
IMPORTANT
Make sure the
spline groove is
facing the desired
direction.
1
2
3
4
6
7
EZ Screen Rail Kit Instructions
5
Residential & Commercial
14