Instructions / Assembly

www.ezhandrail.com for videos 11
EZ Post Installation with Separate Mounting Flange
Ensure that you have a solid mounting surface for your EZ Post base fasteners. Existing posts
or the EZ Posts (sold separately), may be used with this system. If you are installing EZ Posts,
refer to the steps and illustration below.
IMPORTANT: The distance
between posts should not exceed
6 ft. when installed above ground
level. Always refer to your local
building department for building
code clarification.
Note: When
installing the
post base into
ACQ lumber,
use stainless
steel bolts (not
included)
1. Layout posts uniformly or as desired across entire project.
2. Ensure spacing between posts does not exceed 6 ft. for
installs above 24” above the ground (or greater than local
codes specify). Commercial ADA codes require 4’ spacing.
3. Attach post flange to concrete/wood using appropriate
fasteners provided with the EZ Post Kit. MAKE SURE TO
USE ADDITIONAL LUMBER BLOCKING UNDER THE
DECK TO SECURELY FASTEN THE FLANGE!!! In some
instances, fully threaded lag screws may be necessary but
are not included. LAG SCREWS LOOSEN OVER TIME AND
REQUIRE QUARTERLY SAFETY CHECKS.
4. Slide 3”x3” post over post flange and plum using level.
5. Drill ¼” hole front-to-back through the entire post and post
flange coming out on the back side. IT IS IMPORT TO DRILL
HOLES WITH POST LEVEL.
6. Drill 2
nd
¼” hole front-to-back. Start hole 1” above the first
hole. The vertical hole pattern creates the best deflection
strength. Note that hole patterns can be modified if
necessary.
7. Fasten post to post flange with 3 ½” bolt, washers, and
standard nut provided. Washers must be placed on both
sides of the post.
8. After post is level and securely fastened, slide decorative
base cover (optional and sold separately) over post covering
the post flange.
9. Secure next post using same procedure.
3” x 3” Aluminum EZ Post