Installation Guide

www.ezhandrail.com for videos 10
your Smartphone or the rise/run chart at the end of these instructions to
double check that your handrail is angled parallel to your stairs or ramp.
17. Drill a 1/8” pilot hole for the wall bracket fastener. Important: Ensure
your pilot hole is hitting a solid mounting surface if not installing onto EZ
Posts.
18. Drill ¼” hole and loosely bolt wall bracket to the EZ Post.
19. Loosely fasten handrail to the wall bracket using the 1” Phillips head
fasteners provided. See step# 10.
20. Uniformly position and install all intermediate wall brackets and loosely
attach to handrail.
21. Once all the wall brackets, handrail, and handrail components are loosely
fastened in place, firmly secure (tighten down) the handrail system
starting with tightening the wall brackets into the posts.
22. Please refer to Permatex Multi-Metal cure times before allowing access to
the newly installed handrails.
Note: Additional fasteners may be piloted and fastened into the wall brackets for
additional support.