Instructions / Assembly
1
Congratulations
Congratulations! You are on your way to a maintenance free handrail system that is easily
assembled and installed. With your Wolf Handrail system, you’ll feel safe being protected by the
tremendous strength of its aluminum alloy components, plus be comforted knowing the hardened
powder coated finish will last year after year.
Please take a moment to read the instructions before you begin assembling your Wolf Handrail.
Introduction
Check the contents of Wolf Handrail box against the packing list adhered to the back of the Wolf
Handrail box lid. This will allow you to become familiar with the components of your new Wolf
Handrail system.
• Inspect all component parts for familiarity
• Layout recommended tools
• Before cutting any component, know its use – “measure twice and cut once.”
• THE INCLUDED WOOD FASTENERS ARE ACQ TREATED LUMBER
APPROVED.
• THE INCLUDED CONCRETE FASTENERS ARE FOR BRICK AND
CONCRETE.
Wolf Handrail shown with Wolf Posts and Base Covers sold separately.
www.HDEZhandrail.com (for installation Video)
5
7
1. Ensuring the gap from the top of the floor or deck to the bottom of the
bottom channel (A) is less than 4 inches, and that the top of the rail meets
your minimum code requirements vertically center your EZ handrail. Then
attach one of the bottom post mounts (G) to the existing post or EZ post
using the proper fasteners (C) provided. (Hint: Using a 2x4 (3 ½ in.width)
board cut at 3 ¾”, set handrail section on the 2x4 board for correct height.
Reminder: Typical residential minimum handrail height is 36” and the
minimum height for commercial handrail is 42”.
2. Ensuring your EZ handrail is centered vertically on the post; fasten the top
post mount (F) using the proper fasteners provided.
3. Now move to the other end of the railing section. Using the level (or placing
your railing on a 2x4 board) ensure your EZ Handrail section is set at the
required height, vertically centered and fasten the 2
nd
bottom post mount
using the proper fasteners provided.
4.
Ensuring your EZ handrail is centered vertically on the post fasten the 2nd
top post mount using the proper fasteners provided.
5.
Finally, fasten the post mounts (F & G) to the top snap (D) and bottom
channel (A) using the 1” self tapping fasteners provided. (one per mount)
NOTE: REFER TO PAGE 4 FOR EZ POST INSTALLATION
D
F
G
A
C (TYP)
See pg 4
Step
4
NOTE: REFER TO PAGE 4 FOR EZ POST INSTALLATION
See pg. 4
1. Ensuring the gap from the top of the oor or deck to the bottom of the
bottom channel (A) is less than 4 inches, and that the top of the rail meets
your minimum code requirements vertically center your EZ handrail. Then
attach one of the bottom post mounts (G) to the existing post or
EZ post using the proper fasteners (C) provided. (Hint: Using a 2x4
(3 ½ in.width) set handrail section on the 2x4 board for correct height.
Reminder: Typical residential minimum handrail height is 36”
and the minimum height for commercial handrail is 42”.
2. Ensuring your EZ handrail is centered vertically on the post; fasten the
top post mount (F) using the proper fasteners provided.
3. Now move to the other end of the railing section. Using the level (or placing
your railing on a 2x4 board) ensure your EZ Handrail section is set at
the required height, vertically centered and fasten the 2
nd
bottom post
mount using the proper fasteners provided.
4. Ensuring your EZ handrail is centered vertically on the post fasten the 2nd
top post mount using the proper fasteners provided.
5. Finally, fasten the top post mounts (F) and top snap (D) on each side of
the top post mounts using the 1” self tapping fasteners provided.









