PRODUCTS
Note: There are 8 8” spikes provided, we anticipate you will not use all the channels and spikes on one job,
therefore, you would have all of the needed materials for your next job.
For more installation tips and detailed photo examples, please visit our website at www.TheEZRoute.com
TM
EZ ROUTE PREMIER 7101-01-IFU
Step 1: Using a utility knife or reciprocating saw, cut between the
main channels to fit your job specifications (i.e. An 8 loop system
would require you to cut off 4 channels from a new 12 channel EZ
Route Premier Base, using the remainder for your next job).
Step 2: Using a 1/4” drill bit, bore holes in front of at least two of the
front guides and two of the back guides. You can see these located in
the photo #2. You’ll want to have at least 4 stake down points on the
base.
Step 3: Set the unit in place and secure using supplied 8” spikes
(part 7101-01-NP). Drive spikes, at the appropriate angles as indicated,
through the previously drilled holes. When running tube through the
EZ Route Premier it is recommended that the installer place one foot
on the unit . This will aid in keeping the structure in good contact with
the ground and minimize any shifting due to the spikes loosening.
You can begin running your tubes.
Notice in this picture that by cutting the
back-underside of the Premier, you have
the option to run lines from other directions.
7101-01 Premier Product
7101-02 Straight Product
7101-03 Radius Product
7101-01-NP Nail Pack (packaged w/ Premier Product Only)
1.
2.
3.
NOTE:
It is possible to install both the supply
and return of 1/2”, 5/8” or 3/4” diameter tube,
in one channel, for example, a 6 loop
system only requires 6 channels.