Instructions / Assembly

Madden ScreenRail
Instructions
Overview:
This instruction set shows the fabrication of
the integrated railing portion of your screen
enclosure. Additional steps are neccesary
for a complete screen enclosure.
Parts:
A. (2) 2x2" Open back (top and bottom rails)
B. (2) Railing snap (top and bottom rails)
C. (2.5) 1" Square Balusters per ft.
D. (2) Capri Clips
E. (4) 1.5" Fasteners per baluster
F (8) ¾" Self Drilling Fasteners
Kits come in 8'lengths
A
B
C
D
E
F
A
B

Summary of content (2 pages)