Installation Guide
4
4 Installation
Before unpacking the carton, ensure that the packing carton is intact and not damaged or
soaked. Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and
contact the supplier.
After unpacking, check items in the carton against the packing list. If any item is missing,
contact the supplier or agent.
Usually, the packing carton contains all items listed in the packing list shown in Table 3-1.
Table 3-1 package list
4.1 Mechanical size
Dimensions L:75XW:65XH:40MM
4.2 Tool Preparation
To install the EZR33L-A4, prepare tools listed in Table 3-2.
Table 3-2 Tools
Material
PN
Qty
Wireless CPE
EZR33L-A4
1
WIFI Antenna
Rundum-Antennen
Model: EZR
4
Power cable
LAN Cable
1
Net Wire
10m
1
Adapter
PoE Injector
1
Screw to fix L-Bracket
(The Cross and M6)
The Cross and M6x4
4
Bracket
L-Bracket
1
Wrench
T-Wrench
1
Mounting Kit
U-boltsx2
2