Installation Guide

22
Mark the wall where indicated (A), 11 9/16" above the horizontal line and at 5 1/8" distance on the left and right of vertical line. Checking that the two
marks are level.
Insert two wall plugs and two screws into the holes as shown not completely (purchased separately).
Mark the wall where indicated (B), 4 1/4" above the horizontal line and at 5 1/8" distance on the left and right of vertical line. Checking that the two
marks are level.
Insert two wall plugs (purchased separately).
Place a bracket 7.2.1 on the wall as shown about 1 1/8" from the ceiling or upper limit, aligning the center (notch) with the vertical reference line and
mark the wall at the centers of the holes in the bracket.
3ODFHWKHVHFRQGEUDFNHWRQWKHZDOODVVKRZQEHORZWKH¿UVWEUDFNHWDWWKHKHLJKWRIWKHXSSHUFKLPQH\VHFWLRQVXSSOLHGDQGDOLJQLQJWKH
center (notch) with the vertical line.
Mark the wall at the centers of the holes in the bracket and drill ø 5/16" as shown.
Installation screws provided for the Brackets, must be secured with wall plugs (purchased separately).
$
´
´
11
9/16
4
1/4
5
1/8 5 1/8
$
%
$
%
´
>
[
[
´
9