Installation instructions

8
2
5
6
3
4
21
6
5
6
3
4
21
6
12
34
56
12 5/8
4 9/16
´
>
´
24”
24”
4 9/16
7.2.1
2.1
2.1
1
Draw a vertical line on the supporting wall as high as practical, at the center of the area in which
the hood will be installed.
Drawahorizontallineatwherethebottomedgeofthehoodwillbelocatedasindicatedinthegure
that is a minimum of 24" above cooking surface.
Draw a horizontal line where indicated above the cooking surface.
Placeabracket7.2.1onthewallasshownabout11/8" from the ceiling or upper limit, aligning the
center (notch) with the vertical reference line and mark the wall at the centers of the holes in the bracket.
Placethesecondbracket7.2.1onthewallasshown,belowtherstbracket,attheheightofthe
upper chimney section supplied and aligning the center (notch) with the vertical line.
Markthewallatthecentersoftheholesinthebracketandmarkthepoint1and2fortheHoodBody
installationasshown(125/8" from the horizontal line and 4 9/16" from the vertical line).
Drillø5/16"holesatallthecenterpointsmarked(point1,2,3,4,5,6)asshown.