Programmers Manuals

Section 3: Configuring LabelBank
6/08 30 51195 Rev. 1
Options Menu/Rework Date
ENTER REWORK DATE
The Rework Date can be used to compensate for a shift change, or for marking
the produced item dated for the next 24-hour time slot.
This option over-rides the specified Production Date to keep the lot correct when a
change to the packaging date occurs.
1. Press the Rework Date drop-down arrow, or press enter.
2. Press the forward ( ) or reverse ( ) arrows to change the Month.
3. Press on the correct Rework Date.
4. Click the .
The Rework Date menu requires Level 2 Security Clearance.
The Rework Date menu can only be exited by the Menu Key.
The Calendar opens with the Enter Key. This cannot be modified.
Field DESCRIPTION
Options Menu
Rework Date
Allows viewing and editing of the Rework Date.
Configuration Menu
Opens the Configuration Menu.