Programmers Manuals
Section 3: Configuring LabelBank
6/08 30 51195 Rev. 1
Options Menu/Rework Date
ENTER REWORK DATE
The Rework Date can be used to compensate for a shift change, or for marking
the produced item dated for the next 24-hour time slot.
This option over-rides the specified Production Date to keep the lot correct when a
change to the packaging date occurs.
1. Press the Rework Date drop-down arrow, or press enter.
2. Press the forward ( ) or reverse ( ) arrows to change the Month.
3. Press on the correct Rework Date.
4. Click the .
• The Rework Date menu requires Level 2 Security Clearance.
• The Rework Date menu can only be exited by the Menu Key.
• The Calendar opens with the Enter Key. This cannot be modified.
Field DESCRIPTION
Options Menu
• Rework Date
Allows viewing and editing of the Rework Date.
• Configuration Menu
Opens the Configuration Menu.