User guide
Section 3: Wiring
04/12 28 51173 Rev. 8
Installing Load Cells
The cable used in all wiring (other than load cells) must be a minimum of
18 AWG
(Cable 17246).
The Smart Sectional Controller (SSC) boxes are daisy-chained to the end where they
terminate into the Pit Power Supply (24722).
7. Wire the load cells into each section’s Smart Sectional Controllers (SSC), as
illustrated in Appendix 1: Wiring, Drawing 51139-1d.
Load cell drain wires, if applicable, connect to ground lug on the Smart
Sectional Controllers (SSC) exterior.
8. Wire the load cells into the Smart Sectional Controllers (SSC) boxes.
Load Cell Connections at the SSC
TB1 or TB2 in SSC
Terminal Description L/C Wire Color
1 (-) Excitation Black
2 (+) Excitation Green
6 Shield Yellow (bare)
7 (+) Signal White
8 (-) Signal Red
Note: Complete wiring diagram is shown on the following page.