Operation Manual
53
WARNING  SERVICING TO BE CARRIED OUT ONLY BY AN AUTHORISED PERSON
Disconnect from electricity and gas before servicing. Check appliance is safe when you have finished.
Taking care not to damage the burner electrodes, carefully lift the 
hotplate, from underneath disconnect the earth lead at the right 
hand rear from the rear cross member and withdraw the hotplate.
Reassemble in reverse order ensuring that the leads are 
reconnected. Take care not to damage the ignition electrodes of 
the burners.
It is important that the rear earthing leads are replaced when the 
fi xing screws are refi tted as they from part of the cooker earthing.
Check for correct burner operation.
3. To Remove Side Panels
Disconnect from electricity supply.
Remove the Control Panel - see 1. Pull the cooker forward. 
Remove the 4 retaining screws for each panel (1 at the front base, 
1 on the top and 2 at the rear). 
Reassemble in reverse order.
4.  To Remove light Switch
Disconnect from electricity supply.
Remove the Control Panel - see 1.
NB. The old switch may be destroyed during removal. Remove the 
old switch from its bezel by griping the switch body behind the 
control panel and twisting sharply. The switch bezel can then be 
removed by folding back its locking wings and pushing forward. 
Fit the new bezel to the control panel by fi rst lining up the raised 
key on its body with the cutout in the control panel and pushing 
it in from the front. Assemble the new switch to the bezel by 
lining up the key sections and pushing home. Fit the new button 
by pushing in from the front. 
Replace Control Panel in reverse order and test for correct 
operation.
5  To Change an Ignition Switch
Change the gas tap as detailed in Section 9.
6. To Remove Clock
Disconnect from electricity supply.
Remove the Control Panel (See 1). Pull off  the timer control 
button(s).
Remove the timer/mounting bracket assembly from the control 
panel by removing the fi xing screws. 
Remove the timer from its mounting bracket by depressing the 
plastic lugs on the timer case, at the same time pulling the unit 
forward.
Servicing
BEFORE SERVICING ANY GAS CARRYING COMPONENTS. TURN 
OFF THE GAS SUPPLY
Check the appliance is gas sound after completion of service. 
When checking for gas leaks do not use washing up liquid - this 
can corrode. Use a product specifi cally manufactured for leak 
detection.
Do not use re-conditioned or unauthorised gas controls.
Disconnect from the electricity supply before commencing 
servicing, particularly before removing any of the following: 
- control panel, side panels, hotplate tray or any electrical 
components or covers.
Before electrical re-connection, check that the appliance is 
electrically safe.
Note - References to left hand and right hand oven apply as 
viewed from the front.
1  To Remove the Control Panel
Disconnect from electricity supply.
Pull off  all the control knobs.
Open the grill and right hand oven doors and remove the 4 fi xing 
screws underneath the control panel.
The control panel should drop down slightly. It is held at the top 
by two holes in the top edge one at each end that locate on tags 
on the inner panel.
Clear the holes from the inner panel and pull the control panel 
forward.
Disconnect the wiring from the rear.
Reassemble in reverse order. When replacing leads refer to the 
wiring diagram. Check operation of timer.
2. To Remove Hotplate 
Disconnect from electricity supply.
Caution
The ceramic hob material is much more sensitive to scratches 
on the underside than the top.
Take care not to touch or scratch the underside of the ceramic 
as this will weaken the material and cause the top to shatter.
Remove the pan supports and burner heads. Remove the screws 
holding the hotplate burners to the hotplate.
Remove the 6 screws and 2 studs holding the hotplate tray to the 
cooker.










