User manual

62
Traffic-Control
EN
Program 10
Fig. 15: DIP configuration Program 10
This program is used to distribute different vehicles depending on their actual
speed. That speed may vary depending on the capacity of the rechargeable
battery. The speed is measured between E1 and E3 (sensors built into the
roadway). Depending on the result of the measurement slow vehicles will
be steered to parking places via branch-off junctions and thus singled out
of the moving traffic. The other inputs will allow to clear the parking bays
again, at the modeller’s request.
Possible use Timing Distribution on traffic lanes depending on
vehicle speed/capacity of battery
Sensor/But-
ton at input
E1, E3 E2 E4 E6 E8
activates AB
1
AB
2
AB
3
AB
4
P/FR
1
P/FR
2
P/FR
3
P/FR
4
at output A1 A3 A5 A7 A2 A4 A6 A8
for the
period of
Poti 1 2 s 3 s 4 s 5 s 2 s 2 s 2 s 2 s
Table 15: Program 10
X
Set the DIP as required, see Fig. 15.
X
Connect the components, see Table 15.
X
If necessary, set the desired period using the potentiometer.
ADVICE: Please also take into consideration the schematic illustration »Speed
measurement« on page 93 of the present instruction manual.