User Manual
PART 1: HOOD INSTALLATION GUIDE - ISLAND CANOPIES - REMOTE MOTOR
ISL
A
N
D
 HU
NG CANOPY
M
odels include TREVISO F7TV90S1, ROMA F7RM90S1 and TRENTO F7TN12S1
STEP 1: 
Using a weighted stringline (plumb line), determine the central 
position of hood on the ceiling. It is best to centre the hood unit to 
the cooktop below. Mark the position. Before making the cut out, 
check for obstructions like electrical cables, etc.
Next measure the distance from cooktop to the ceiling and 
decide the height you wish to position the hood at and take the 
measurement as illustrated. 
NOTE: 
The height of the underside of the hood body must be a 
minimum of 600 mm above an electric cooktop & 650 mm above 
a gas cooktop and a maximum height of 1200 mm. If the 
instructions of the hob specify a greater distance than the 
minimum detailed, this shall be the minimum height for 
installation. Building codes that stipulate a minimum dimension 
may vary from state to state, please check with your local council 
prior to installation.
TRENTO F7TN12S1 model only - The height of the underside of 
the hood body must be a minimum of 1200 mm above a BBQ.
STEP 2: 
Slide the two parts of the trellis (T) and (T1) to the required 
height established in step 1.
When the height is set, insert the 8 screws (V2) to secure the 
two parts of the trellis (T) and (T1) together.
Mark 4 drilling points on the ceiling, drill (2.1 ) Put in 4 x ΓΈ 8mm 
expansion bolts and secure the trellis assembly (T+T1) to the 
ceiling by the relative screws (V1) 
Feed the Flexi Duct down the inside of the roof braket and let 
hand , ready to be attached to the flange of the rangehood in 
step 6
WARNING
DIMENSIONS ARE ACCURATE AT THE TIME OF PRINTING, PR KITCHEN & WASHROOM 
SYSTEMS PTY LTD RESERVES THE RIGHT TO CHANGE SPECIFICATIONS WITHOUT NOTICE. 
FOR BUILDING PURPOSES THE UNIT SHOULD BE PROVIDED TO THE CABINET MAKER / 
BUILDER / KITCHEN DESIGNER FOR EXACT MEASUREMENTS.
CEILING
SOFFITTO
CEILING
SOFFITTO
FALSE CEILING
CONTROSOFFITTO
1
1










