TE [5H] Loe id CEILING 3FT TO 6FT WALL SCREW EYE HOOK STRING INSTALLATION INSTRUCTIONS: 1) SCREW THE METAL HOOK INTO THE CENTER HOLE (SECOND HOLE FROM THE BOTTOM). 2) SCREW THE BOARD ON THE WALL 4 TO 5 RING FEET HIGH USING THE INCLUDED SCREWS. 3) SCREW THE EYE HOOK INTO THE CEILING 3 TO 6 FEET FROM THE WALL. HOOK 4) PLACE THE RING ON THE HOOK AND RUN THE LOOSE END OF THE STRING THROUGH WALL SCREW RLU [ele] 8 5) TIGHTEN THE STRING UNTIL THE SLACK HAS BEEN REMOVED.