Fast & Fluid Management – SK350 FAST & FLUID MANAGEMENT SK350 ENGLISH V 2.
Fast & Fluid Management – SK350 Table of Contents SK350 Manual Introduction, warranty & CE certification Main SK350 components Safety instructions Installation Operation Maintenance Problem solving Service and Support, Fuses Specifications Electrical wiring diagram Contributing to the Protection of the Environment V 2.0 Pag. 3 Pag. 4 Pag. 5 Pag. 6 – 8 Pag. 9 – 12 Pag. 13 Pag. 14 – 15 Pag. 15 Pag. 16 Pag. 17 Pag.
Fast & Fluid Management – SK350 Introduction & warranty Introduction By selecting a Fast & Fluid Management shaker you have opted for a product which is the result of intensive research. Top-quality components, craftsmanship and a modern ergonomic design all serve to guarantee a long service life and a high degree of user friendliness. Warranty In these warranty conditions, 'F&FM' is understood to mean Fast & Fluid Management.
Fast & Fluid Management – SK350 Main SK350 components 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Top lid Keyboard & Emergency stop button Transformer Power Board Removable front panel Clamping plate Super strut – suspension Door handle Shaker frame Can table Can mounting rim Excenter axle Shaker motor & driving belt 1. 2. 5. 6. 8. 11 4. 3. 7. 9. 10. 12. 13. V 2.
Fast & Fluid Management – SK350 Safety instructions General safety instructions Attention! Before installing the equipment and setting it in operation, please read the instructions carefully. This is safer both for yourself and prevents unnecessary damage to the machine. The manufacturer accepts no liability if the instructions below are not followed: 1. If a machine has been damaged (during transport, for example), do not attempt to set it in operation.
Fast & Fluid Management – SK350 Installation Step 1 - Unpack the machine and unlock the frame lock > Remove box and plastic foil. Note the frame lock bolts on either side of the machine. > Remove both bolts with a size 17 fork wrench. By removing the bolts, the frame lock’s wooden block is released. Be careful not to damage the body and surfaces of your SK350 with any tools while unpacking it.
Fast & Fluid Management – SK350 Step 3 - Detach shaker from its transport skid > Pull out cord to remove frame lock’s loose parts. Ensure all loose parts have been removed – two bolts and two wooden blocks. For optimal mixing results and silent operation it is essential to correctly level the machine and lock the adjustable feet. Step 4 - Place the machine in its final operational position > Lower the adjustable feet far enough to lift the machine off its wheels.
Fast & Fluid Management – SK350 Step 5 - Electrical connection > Connect the power cable to the socket at the rear of the machine. Ensure the emergency stop is unlocked (turn clockwise). Attention! To prevent damage, the SK350 may only be connected to either 220-240V/16A/50Hz power grids. V 2.
Fast & Fluid Management – SK350 Operation A - First time operation Attention! Before operating your SK350 for the first time, please ensure the frame lock was correctly removed (as indicated in pag.6) Step 1 – SK350 power management Turn the emergency stop clockwise to unlock: the power led is lighted-ON. Unlock the emergency stop button on the front of the machine by turning clockwise.
Fast & Fluid Management – SK350 Step 2 - Correct placement of cans and other containers > Place one or more containers at gravitational center of the can table, between the spindles. > Place filler disc on lid to prevent displacement during operation. Remove the can handle before shaking. When mixing more than one can, use adhesive tape. Step 3 – SK350 Control interface Power led Machine power-ON Emergency stop Timer Stop & Up for shutting off power Shaking keys Program stop V 2.
Fast & Fluid Management – SK350 B - Operating the SK350 Step 1 - Place can, choose the shaking time and push the start key > Place the container in the can table center, place filler disc > Close door. Choose shaking time T1, T2 or T3 and press desired timing button. Clamping and mixing will now start. Attention! The mixing program will not start unless the door is closed. Step 2 - Program ends or is interrupted, remove can > To interrupt the mixing program, press the stop button.
Fast & Fluid Management – SK350 C - User of the SK350 Keyboard Power Led Emergency button Start T1 Start T2 Start T3 Stop Up Check if the machine has been correctly installed and power on Turn the emergency stop clockwise to unlock Open the door and container(s) inside as described in the chapter “operation” step 2. Close the door. Push on start key(s) to start the machine. Follow the default shaker times. T1 30sec. T2 60sec. T3 150sec.
Fast & Fluid Management – SK350 Maintenance Keep your SK350 clean and free of paint residue > Remove all spilt paint from accessible parts (especially clamping plate spindles). Use diluted detergent only and Teflon spray only. Though the SK350 is designed to be completely maintenance free, periodic greasing of moving parts will ensure it remains in top shape. Attention! MOVING PARTS CAN CAUSE INJURY. Always turn off power (e.g. by pressing emergency stop) before accessing moving parts. V 2.
Fast & Fluid Management – SK350 Problem solving Introduction Before calling your machine supplier or Service Department, please check whether you can solve the problem yourself. If you cannot, then call the Service Department for advice. Have the model number and serial number at hand (these can be found on the silver sticker at the back of the machine). Use the Problem Solving chart below to judge whether you can solve a problem yourself or whether you need to call in the Service Department.
Fast & Fluid Management – SK350 Machine starts shaking before the container has been clamped Too much spindle resistance Clean the spindles and lubricate Clamping plate force incorrectly set Call service Clamping plate will not go up after mixing Clamping plate is jammed call service Clamping motor is defective Call service Cable of the clamping motor is defective Call service Main board is defective Call service Container(s) not centered Replace container(s) in gravitational centre.
Fast & Fluid Management – SK350 Specifications Maximum product weight 35 kg Timer Default shaking time: T1=30sec; T2=60sec.; T3=150sec OR T1+T2=1min.&30sec; T1+T3=3min.; T2+T3=3min.&30sec.; T1+T2+T3=4min.
Fast & Fluid Management – SK350 Electrical wiring diagram V 2.
Fast & Fluid Management – SK350 Contributing to the Protection of the Environment Packaging Material The packaging protects the machine against damage during transport. The packaging material was chosen based on its limited impact on the environment and its inherent possibilities for waste-disposal. The reuse of packaging material saves raw materials and produces less waste material. Generally speaking, your supplier will take the packaging off your hands.
Fast & Fluid Management – SK350 © Fast & Fluid, 2013 www.Fast-Fluid.com V 2.