User's Manual

Liberator-V1000 User Manual Rev 04v05
Page 11 of 85 FBN Doc #: FBN-0125_04v05
2.3 Package Contents
A complete link is packed in one box. The box contains the following:
Liberator-V1000 Single-port
Liberator-V1000 Dual-port
Terminal A
Terminal A
Terminal B
Terminal B
2 x Adjustable Alignment Brackets
2 x Adjustable Alignment Brackets
2 x Fixing and Accessory Kit
2 x Fixing and Accessory Kit
1 x Quick Start Guide
1 x Quick Start Guide
2 x Ice bridges
2 x Cable glands for primary port only
2 x RJ45 Seal Kits
1 x voltmeter alignment cable
1 x voltmeter alignment cable
2 x PoE++ mains power injectors 2 x PoE++ mains power
injectors (these may not be included in all kits, please check
ordering guide)
Figure 4 Contents of V1000 Single-port Link Kit (EU mains plug version), showing parts for one end of the
link. Each V1000 Link Kit contains 2 sets of these parts (one set for each end of the link).
NOTE: - In the USA and Canada, the PoE power supply may be ordered separately from the rest of the link kit.
Please check the ordering guide for more information.