Instructions / Assembly

GLD Products RENO II 7.5’ Pool Table
Item 64-0126
14 1-800-225-7593
www.gldproducts.com
STEP 9 - SECURING AND LEVELING THE TABLE TOP
When the table top is in position, and not screwed down, it is flat.
1. Be certain the table base is in it’s final position and level.
2. The table top must be in it’s final position.
3. Finger tighten all the bolts.
CAUTION: If using a power tool to tighten the bolts, be certain it is on a low torque setting.
4. Using the proper wrench, lightly tighten each bolt without crushing the underside
supports.
5. When the bolts are secure, test for level. Roll one of the pool balls slowly over the playing
surface. If the ball rolls on a straight path, the table is level. If the path curves, the table
needs to be leveled (see Step 7).
6. If the two support beams need to be tightened do it now. Tighten the four bolts until snug.
Over-tightening may lift the table top upward.