Installation Instructions
Drill 1/4” diameter holes through posts and insert
Protector Sleeves at all necessary locations. Tap with
a hammer until flange is flush with the post face.
Only use Sleeves on the faces of posts where the cable
enters a drill hole at an angle (e.g. stair transition
posts or outside faces of double corner posts).