Installation Instructions

2
1-800-888-2418 | www.feeneyinc.com
© 2013 Feeney Inc. All rights reserved.
Once all pickets have been installed, the railing frame will be ready for installing the cables. Follow the CableRail by Feeney installation
instructions to complete the railing inll installation. If you have questions, please call us at1-800-888-2418.
(with bottom rail)
(without bottom rail)
• Slide the picket into position and verify that it is plumb.
• Confirm that all picket cable holes are properly aligned with holes in the
posts.
• Drill 1/8”diameter pilot holes for the screws (softer woods may need a
smaller pilot drill).
• Secure the picket into position with screws.
STEP 4 - Attach Picket to Railing
• Screw the Base Plates to both ends of the picket using an electric drill
with a #2 square drive bit.
Important Note: To prevent screw head damage and ease
installation, lubricate the screw threads with wax or soap prior to
attachment and drive the screws slowly and smoothly with minimal
stopping and starting. In addition, be sure to firmly secure the picket
so that it won’t move during attachment of the base plates.
STEP 3 - Attach Base Plates
Installation Instructions
Feeney
®
Intermediate Picket (SKU#7648) - For Level Railings Only
v 04/2013