Installation Instructions

2
1-800-888-2418 | www.feeneyinc.com
© 2013 Feeney Inc. All rights reserved.
Once all pickets have been installed, the railing frame will be ready for installing the cables. Follow the CableRail by Feeney installation
instructions to complete the railing inll installation. If you have questions, please call us at1-800-888-2418.
• Slide the picket into position and verify that it is plumb.
• Confirm that all picket cable holes are properly aligned with holes in the
posts.
• Drill 1/8”diameter pilot holes for the screws (softer woods may need a
smaller pilot drill).
• Secure the picket into position with screws.
STEP 4 - Attach Picket to Railing
(without bottom rail)(with bottom rail)
• Screw the Base Plates to both ends of the picket using an electric drill
with a #2 square drive bit.
Important Note: To ease installation and prevent possible screw
head damage, lubricate the screw threads with wax or soap prior to
attachment and drive the screws slowly and smoothly with minimal
stopping and starting. In addition, be sure to firmly secure the picket
so that it won’t move during attachment of the base plates.
STEP 3 - Attach Base Plates
use angled countersink
hole for sloped applications
use straight countersink
hole for level applications
Installation Instructions
Feeney
®
Intermediate Picket (SKU#7649) - For Stair Railings Only
v 04/2013