Users Manual Part 1
Getting started
30
Site requirements
Caution
z
Ensure that the laboratory floor is level and with a gradient of less than
1/200.
z
Ensure that the laboratory is free of dust, corrosive and flammable gas, and
heat and wind sources.
z
Ensure that the laboratory is away from direct sunlight and is well
ventilated. We recommend that you refer to the standard of a biosafety
level (BSL) 2 laboratory.
z
We recommend that you use a clean laboratory with ISO Class 8 air
cleanliness. Ensure that air can be circulated inside the laboratory but
cannot be circulated to other laboratories.
z
The device should be used with the ultra-pure water machine, refrigerator,
and DNB loader, and can be used with the library preparation system.
Therefore, enough space should be considered when placing the above
instruments.
z
Ensure that enough space is provided around the device for ventilation,
cable connection, and power switch operation.
The following figure indicates distances that are required for optimal
operation and access.
≥
1500 mm (59.1 inches)
B
A
B
≥
1000 mm (39.4 inches)
Operation area
B
B
A
Figure 13 Space requirements
Network requirements
Operating environments of the computer
Minimum configuration
Processor: Intel Core i7-7700