Users Manual Part 1

Getting started
32
To ensure that the performance of the device meets the
specifications, the technical support will perform a standard
sequencing run before customer training and use.
Powering on or off the device
Caution
z
Ensure that the power switch is in the OFF position before connecting to
the power supply.
z
Ensure that the grounding cable is connected in accordance with the
relevant standard or under the guidance of an experienced electrician.
z
Only the power cord of the manufacturer can be used, and the power cord
can be only used with this device. Failure to do so might damage the power
cord or device.
Powering on the device
Perform the following steps:
1. If a UPS is prepared, connect the UPS to the device.
2. Turn the power switch of the device to the ON position.
After you power on the device, self-test begins.
Powering off the device
Before you power off the device, ensure that the sequencing run and wash
are completed, the control software is shut down, and the flow cell drive is
withdrawn. Failure to do so might damage the device.
Perform the following steps:
1. Tap , select Shut down. In the pop-up dialog box, select Shut
down.
2. Turn the power switch to the OFF position.