Users Manual Part 1

Getting started
34
Preparing the power supply
Caution
z
To ensure a steady and uninterrupted power supply to the device during
operation, we recommend the use of a separate UPS. For details about the
UPS installation protocol, consult the UPS supplier.
z
The required power supply of the UPS should be no less than 5 kVA.
Connect the power cord of the device to the output port of the UPS.
z
Ensure that the voltage meets the requirement to prevent poor
performance of electric components. Failure to do so might damage
electrical components.
Table 2 Power specifications
Item Description
Voltage and frequency range 200 V - 240 V
~
, 50/60 Hz
Voltage fluctuation
±
10%
Rated power 3000 VA
Transient over-voltage category II
Preparing peripheral devices
Table 3 Peripheral devices
Device
Recommended
supplier
Remarks
DNB loader
The
manufacturer
/
Sample
preparation
system
The
manufacturer
/
Ultra-pure
water machine
General
laboratory
supplier
/
Frost-free
freezers or
refrigerators
/
Temperature ranges (according to
requirements):
z
2 ℃ to 8 ℃ (36 ℉ to 46 ℉ )
z
-18 ℃ to - 25 ℃ (-0.4 ℉ to -13 ℉)