User Manual

(E) 9/05
ASSEMB LY I NST R UCT I ONS FOR F2046/3
MUR R AY FEI SS
©M UR R AY FEI SS I M PO RT LL C.
IMPORTANT
TURN OFF POWER AT MAIN FUSE OR
CIRCUIT BREAKER BOX BEFORE
STARTING INSTALLATION
Carefully unpack and identify all parts 
before assembly. Bulbs are not included.
1. Install center body by screwing into center 
column.
2. Screw threaded pipe into bottom of socket 
assembly. Note correct position of threaded 
pipe at illustration.
3. Install arms onto center body by fastening 
with ball cap nuts.
NOTE: Extra ball cap nuts can be 
found in a plastic pouch attached inside 
of box.
4. Follow enclosed “Chain Suspended
Fixture Installation Instructions” for
electrical and fixture installation onto
ceiling outlet box.
5. Install bulbs (not included). See  relamping 
label located at socket area for type and 
maximum allowed wattage.
6. Slip glass shade through threaded pipe. Lock
them into position by fastening with washer 
and hex nut. Do not over tighten.
7. Slip cap and fasten finial onto threaded pipe.
8. Position glass shade to align holes properly 
with arms. Slip ball cap screw through hole 
in glass and then through tab. Secure them 
together by fastening with small hex nut 
from behind. IMPORTANT: DO NOT 
OVER TIGHTEN.
Bulb
(not included)
Tab
Socket Assembly
Long Threaded Pipe
Glass Shade
Cap
Ball Cap Screw
Flat Washer
Hex Nut
Finial
Center Column
Small Hex Nut
Arm
Center Body
Fixture Loop

Summary of content (1 pages)