User Manual

4. Commissioning
4-29
Festo P.BE-SPC11-SYS-EN en 1406e
The O1 output supplies a 1-signal The drive is now ready for
operation.
When the teach procedure is concluded, the SPC11 knows
the locations of the mechanical end positi o ns (P.01...P.02).
You can now teach manually the intermediate positions
(P.03...P.04) or trigger a positioning task to the end positions
(P.01...P.02).