Installation Guide
2-1/8 in.
RAIL BRACKET INSTALLATION ON
ALUMINUM POST
Step 1: Install bottom rail bracket.
Measure up 2-1/8 in. from the deck surface and make a horizontal line with a
pencil onto the post (Figure 1). Locate the BOTTOM edge of the backing plate
along the horizontal line. Take care to ensure the backing plate is centered on
the post, with the two mounting holes side-by-side. Mark the center of the two
mounting holes located inside the backing plate against the post.
Locate the bracket over the marked mounting holes, and install two #10 x 3/4
in. screws through the bracket and into the aluminum post. Do not overtighten
screws.
NOTE: If installing into a wood post, use two #12 x 2 in. pan head screws. Pre-
drill the marked holes with a 1/8 in. drill bit. See "Aluminum Rail Installation
with Fiberon Composite Post Sleeves" for more detailed instructions when
installing into a wood post.
Step 2: Install top rail bracket.
Measure up 33-15/16 in., for 36 in. rail height, or 39-15/16 in., for 42 in. rail
height, from the top of the deck surface and make a horizontal line with a
pencil onto the post (Figure 2). Locate the top rail bracket against the post,
aligning the BOTTOM of the bracket with the marked line. Take care to ensure
the bracket is centered on the post. Mark the center of the two mounting holes
located inside the bracket against the post.
Locate the bracket over the marked mounting holes, and install two #10 x 3/4
in. screws through the bracket and into the aluminum post. Do not overtighten
screws.
NOTE: If installing into a wood post, use two #12 x 2 in. pan head screws. Pre-
drill the marked holes with a 1/8 in. drill bit. See "Aluminum Rail Installation
with Fiberon Composite Post Sleeves" for more detailed instructions when
installing into a wood post.
TOOLS REQUIRED
• Power drill
• 1/8 in. drill bit (for optional pilot hole pre-drilling)
• Tape measure
• Screwdriver or power drill for T25 Torx screws
• Safety glasses
• Pencil
• Speed square
KIT CONTENTS
• Top Rail Bracket
• Bottom Rail Bracket
• (4) #10 x 3/4 in. Torx Screws
• (4) #12 x 2 in. pan head Torx Screws
(for backing plate into wood post)
• Instruction Sheet
TIPS
The most recent installation instructions
can be found on our website. Please visit
fiberondecking.com or call customer
service at 800-573-8841.
Baseplate
Figure 2
33-15/16 in.
(36 in. rail height)
39-15/16 in.
(42 in. rail height)
PRIOR TO INSTALLING:
Please consult local zoning laws in regards to load requirements, overall height requirements, and bottom space requirements for rails. All supporting structures must
be in accordance with applicable building codes. Neighborhood associations and / or historic districts may regulate size, placement and type of railing. Apply for
permits if required by local authorities and codes. Ensure compliance prior to installation. Local building code requirements will always supersede any and all suggested
procedures and measurements in the following installation. The following installation instructions are intended as a general guideline based on common building
practices used in railing installation.
NOTE: These instructions are applicable to each rail profile and
SKU numbers listed below:
CONTEMPORARY
• 13876
TRADITIONAL
• 10099
Page 1 of 2fiberondecking.com
Aluminum Rail Bracket Installation
Figure 1
Creation Date: 06/23